Upgrade Computer Systems - (TOPS, Enterprise Systems)
This map shows the location of the project. For projects that do not have a specific location but affect a line/route or the entire system, either the affected lines/routes are shown, or an entire service area map is shown.
If you select the option to “toggle the benefit layer,” you will see an approximation of the area that will benefit from the project.
Each capital project is measured on 15 evaluation metrics to better understand its impact on the region. Learn more about the metrics and see a legend for all measures here.
Click the circled (i) information button to read a definition of each metric and hover over the image to see more about each measure.
Project programmed before 2024; Not evaluated by these metrics.
Project Description
To upgrade TOPS to Version 2025 or higher. In order to be on the most recent software refresh and technological architecture the TOPS applications should be upgraded every 3-4 years to utilize the latest software algorithms and better means of doing business. The current contract with Trapeze calls for 2 different TOPS upgrade. This request is for the 2nd TOPS upgrade request. This project will be to upgrade the TOPS application, and its related hardware. This includes upgrading the TOPS application, Viewpoint application, and the several interfaces with other enterprise applications like TOPS, ERP, Hastus, LMS etc. The hardware infrastructure for the TOPS servers (Dev, Test, Training, PROD) will need to be upgraded along with The Tap / SIT boxes that are spread across the various CTA facilities will also need to be upgraded.