Project_Year Project_Name Project_Type Program Grantee RTA_Funds Local_Funds Federal_Funds Total_Funds Status
2022 Berkeley Access to Bus Route Improvements Pedestrian Access to Transit Access to Transit Program Berkeley 50000 0 0 50000 Completed
2022 Harvard Bus Stop Access Improvements Pedestrian Access to Transit Access to Transit Program Harvard 47000 0 0 47000 Completed
2022 University Park Metra Station Access Improvements Pedestrian Access to Transit Access to Transit Program University Park 50000 0 0 50000 Completed
2022 Sauk Village Pace Bus Route Access Improvements Pedestrian Access to Transit Access to Transit Program Sauk Village 50000 0 0 50000 In Progress
2022 Calumet Park Pace and Metra Access Improvements Pedestrian Access to Transit Access to Transit Program Calumet Park 52825 0 211301 264126 In Progress
2022 Evanston Pace and CTA Access Improvements Pedestrian Access to Transit Access to Transit Program Evanston 30048 30048 240385 300481 In Progress
2022 Franklin Park Pace and Metra Improvements Pedestrian Access to Transit Access to Transit Program Franklin Park 63169 114870 712157 890196 In Progress
2022 Hoffman Estates Pace Improvements Pedestrian Access to Transit Access to Transit Program Hoffman Estates 67500 67500 540000 675000 In Progress
2022 Northbrook Pace and Metra Improvements Pedestrian Access to Transit Access to Transit Program Northbrook 20086 20086 160691 200863 In Progress
2022 Prospect Heights Pace and Metra Improvements Pedestrian Access to Transit Access to Transit Program Prospect Heights 89347 284678 1496098 1870123 In Progress
2020 North Chicago Pace Bus Route Access Improvements Pedestrian Access to Transit Access to Transit Program North Chicago 103539 0 414155 517694 In Progress
2020 Park Forest Pace Bus Route and Metra Station Access Improvements Pedestrian Access to Transit Access to Transit Program Park Forest 46560 0 186242 232802 Completed
2020 Midlothian Metra Station Access Improvements - Part II Pedestrian Access to Transit Access to Transit Program Midlothian 69100 69100 552800 691000 In Progress
2020 Niles Pace Bus Route Access Improvements Pedestrian Access to Transit Access to Transit Program Niles 79572 79572 636577 795721 In Progress
2020 Aurora Transportation Center Access Improvements Pedestrian Access to Transit Access to Transit Program Aurora 99528 99528 796227 995283 In Progress
2020 Blue Island Metra Station Access Improvements Pedestrian Access to Transit Access to Transit Program Blue Island 93800 0 375200 469000 In Progress
2020 Calumet Park Ashland Metra Station Access Improvements Pedestrian Access to Transit Access to Transit Program Calumet Park 65858 0 263433 329291 In Progress
2018 Bensenville Metra Station Access Improvements Pedestrian Access to Transit Access to Transit Program Bensenville 0 100000 400000 500000 Completed
2018 Melrose Park Metra Station and Pace Route Access Improvements Pedestrian Access to Transit Access to Transit Program Melrose Park 18700 56100 299200 374000 In Progress
2018 Chicago Heights Pace Route Access Improvements Pedestrian Access to Transit Access to Transit Program Chicago Heights 12492 12492 99936 124920 In Progress
2018 Northlake Pace Route Access Improvements Pedestrian Access to Transit Access to Transit Program Northlake 11496 34488 183936 229920 In Progress
2018 Brookfield Metra Station Bicycle Parking Pedestrian Access to Transit Access to Transit Program Brookfield 13857 41573 221720 277150 Completed
2018 Waukegan Metra Station and Pace Route Access Improvements Pedestrian Access to Transit Access to Transit Program Waukegan 13044 39132 208704 260880 In Progress
2016 Richton Park Metra Station and Pace Route Access Improvements Pedestrian Access to Transit Access to Transit Program Richton Park 70401 0 281602 352003 Completed
2016 Evanston Main Street Station Bicycle Parking Pedestrian Access to Transit Access to Transit Program Evanston 14000 0 56000 70000 Completed
2016 University Park Pace Route Access Improvements Pedestrian Access to Transit Access to Transit Program University Park 98350 0 393400 491750 Completed
2016 Bellwood Pace Route Access Improvements Pedestrian Access to Transit Access to Transit Program Bellwood 150000 0 600000 750000 Completed
2016 Lake Villa Metra Station Access Improvements Pedestrian Access to Transit Access to Transit Program Lake Villa 66000 0 264000 330000 Completed
2016 Chicago Ridge Metra Station and Pace Route Access Improvements Pedestrian Access to Transit Access to Transit Program Chicago Ridge 199647 0 798592 998239 Completed
2016 Oak Forest Metra Station and Pace Route Improvements Pedestrian Access to Transit Access to Transit Program Oak Forest 112977 0 451910 564887 In Progress
2016 Mount Prospect Metra Station Bicycle Parking Pedestrian Access to Transit Access to Transit Program Mount Prospect 33700 0 134800 168500 Completed
2016 Skokie CTA Station Access Improvements Pedestrian Access to Transit Access to Transit Program Skokie 62952 0 251808 314760 In Progress
2016 Midlothian Metra Station Access Improvements Pedestrian Access to Transit Access to Transit Program Midlothian 196000 0 784000 980000 Completed
2014 Palos Heights Pace Route Access Improvements Pedestrian Access to Transit Access to Transit Program Palos Heights 124000 0 496190 620190 Completed
2014 Rolling Meadows Pace Route Access Improvements Pedestrian Access to Transit Access to Transit Program Rolling Meadows 243000 0 973500 1216500 Completed
2014 La Grange Metra Station Access Improvements Pedestrian Access to Transit Access to Transit Program La Grange 77000 0 308100 385100 Completed
2014 Glen Ellyn Pace Route Access Improvement Pedestrian Access to Transit Access to Transit Program Glen Ellyn 37000 0 150720 187720 Completed
2022 Sauk Trail and Torrence Ave Corridor Study Corridor Planning Community Planning Sauk Village 156750 8250 0 165000 Programmed
2022 Pace Far South Halsted Street Corridor Study Corridor Planning Community Planning Pace Suburban Bus 220000 55000 0 275000 Programmed
2020 Chicago Auburn Gresham 79th Street Corridor Plan Corridor Planning Community Planning Chicago 114000 6000 0 120000 In Progress
2019 Chicago 31st Street Little Village Corridor Study Corridor Planning Community Planning Chicago 64000 16000 0 80000 In Progress
2018 Chicago - South Shore Corridor Study Corridor Planning Community Planning Chicago 28729 7302 110000 146031 Completed
2016 Pace Central Harlem Avenue Corridor Study Corridor Planning Community Planning Pace Suburban Bus 0 39900 159600 199500 Completed
2016 CTA Bus Corridor Slow Zone Improvement Initiatives Corridor Planning Community Planning Chicago Transit Authority (CTA) 254876 63719 0 318595 Completed
2015 Pace North Avenue Corridor Study Corridor Planning Community Planning Pace Suburban Bus 0 40000 160000 200000 Completed
2014 Melrose Park Broadway Avenue Corridor Plan Corridor Planning Community Planning Melrose Park 0 20000 79998 99998 Completed
2013 Ridgeland Avenue Corridor Study Corridor Planning Community Planning Cook County Department of Transportation and Highways 160000 40000 0 200000 Completed
2009 Pace Harlem Avenue Corridor Plan Corridor Planning Community Planning Southwest Conference of Mayors 157724 39431 0 197155 Completed
2007 Kane County Randall Road Pace Route 529 Plan Corridor Planning Community Planning Kane County 0 25000 100000 125000 Completed
2004 Niles Bus Oriented-Development Plan for Milwaukee Avenue Corridor Planning Community Planning Niles 10000 10000 80000 100000 Completed
2022 Cary TOD Developer Discussion Panel Developer Panel Community Planning Cary 3500 0 0 3500 Completed
2022 Cicero TOD Developer Discussion Panel Developer Panel Community Planning Cicero 3500 0 0 3500 Completed
2021 Brookfield Developer Discussion Panel - Congress Park Station Developer Panel Community Planning Brookfield 3500 0 0 3500 Completed
2020 Milwaukee Ave. Developer Panel Developer Panel Community Planning Chicago 45th Ward 3500 0 0 3500 Completed
2020 Calumet Park TOD Developer Discussion Panel Developer Panel Community Planning Calumet Park 3500 0 0 3500 Completed
2018 Winthrop Harbor Developer Discussion Panel Developer Panel Community Planning Winthrop Harbor 3000 0 0 3000 Completed
2018 Brookfield Developer Discussion Panel - Brookfield Station Developer Panel Community Planning Brookfield 3000 0 0 3000 Completed
2016 Des Plaines TOD Developer Discussion Panel Developer Panel Community Planning Des Plaines 3000 0 0 3000 Completed
2016 Morton Grove Developer Discussion Panel Developer Panel Community Planning Morton Grove 3000 0 0 3000 Completed
2015 River Grove Developer Discussion Panel Developer Panel Community Planning River Grove 3000 0 0 3000 Completed
2015 Skokie Developer Discussion Panel Developer Panel Community Planning Skokie 3000 0 0 3000 Completed
2015 West Chicago Developer Discussion Panel Developer Panel Community Planning West Chicago 3000 0 0 3000 Completed
2014 Fox Lake Developer Discussion Panel Developer Panel Community Planning Fox Lake 3000 0 0 3000 Completed
2014 Bellwood Developer Discussion Panel Developer Panel Community Planning Bellwood 3000 0 0 3000 Completed
2014 Lemont Developer Discussion Panel Developer Panel Community Planning Lemont 3000 0 0 3000 Completed
2014 Forest Park Developer Discussion Panel Developer Panel Community Planning Forest Park 3000 0 0 3000 Completed
2014 Tinley Park Developer / Financial Advisory Panel Developer Panel Community Planning Tinley Park 3000 0 0 3000 Completed
2013 New Lenox Developer Discussion Panel Developer Panel Community Planning New Lenox 3750 0 0 3750 Completed
2013 Villa Park Developer Discussion Panel Developer Panel Community Planning Villa Park 3750 0 0 3750 Completed
2013 Oak Forest Developer Discussion Panel Developer Panel Community Planning Oak Forest 3750 0 0 3750 Completed
2013 University Park Developer Discussion Panel Developer Panel Community Planning University Park 3500 0 0 3500 Completed
2013 Hanover Park Developer Discussion Panel Developer Panel Community Planning Hanover Park 3750 0 0 3750 Completed
2013 Richton Park Developer Discussion Panel Developer Panel Community Planning Richton Park 3750 0 0 3750 Completed
2013 Blue Island Developer Discussion Panel Developer Panel Community Planning Blue Island 3750 0 0 3750 Completed
2013 Park Forest Developer Discussion Panel Developer Panel Community Planning Park Forest 3750 0 0 3750 Completed
2012 Wood Dale Developer Discussion Panel Developer Panel Community Planning Wood Dale 3500 0 0 3500 Completed
2012 Bensenville Developer Discussion Panel Developer Panel Community Planning Bensenville 3500 0 0 3500 Completed
2012 Manhattan Developer Discussion Panel Developer Panel Community Planning Manhattan 3500 0 0 3500 Completed
2012 Mokena Developer Discussion Panel Developer Panel Community Planning Mokena 3500 0 0 3500 Completed
2012 Franklin Park Developer Discussion Panel Developer Panel Community Planning Franklin Park 3500 0 0 3500 Completed
2012 Midlothian Developer Discussion Panel Developer Panel Community Planning Midlothian 3500 0 0 3500 Completed
2012 Maywood Developer Discussion Panel Developer Panel Community Planning Maywood 3500 0 0 3500 Completed
2015 Aurora Pedestrian Access to Transit Improvement Plan Pedestrian Access to Transit Community Planning Aurora 0 0 0 0 Completed
2014 Park Forest TOD Pedestrian Access Plan Pedestrian Access to Transit Community Planning Park Forest 0 0 0 0 Completed
2012 Robbins Pedestrian Access Improvement Plan Pedestrian Access to Transit Community Planning Robbins 11857 0 47426 59283 Completed
2012 La Grange Stone Avenue Station Access Improvement Plan Pedestrian Access to Transit Community Planning La Grange 0 0 0 0 Completed
2021 Kimball Station Area Curbside Management and Mobility Study Pedestrian Access to Transit - Mobility Management Community Planning Chicago 90000 110000 0 200000 Programmed
2019 Park Forest, Matteson and Richton Park Transportation Alternatives Study Pedestrian Access to Transit - Mobility Management Community Planning Park Forest 1000 0 0 1000 Completed
2022 La Grange TOD Plan Update TOD Plan Update Community Planning La Grange 80000 20000 0 100000 Programmed
2022 Richton Park TOD Plan Update TOD Plan Update Community Planning Richton Park 108000 12000 0 120000 Programmed
2020 Harvey TOD Plan Update TOD Plan Update Community Planning Harvey 25920 2500 113679 142099 Completed
2020 University Park TOD Plan Update TOD Plan Update Community Planning University Park 25484 2500 111935 139919 In Progress
2021 Berwyn TOD Zoning Code Update TOD Zoning Community Planning Berwyn 25000 0 0 25000 In Progress
2021 Maywood TOD Zoning Code Update TOD Zoning Community Planning Maywood 30000 0 0 30000 In Progress
2021 Robbins TOD Zoning Code Update TOD Zoning Community Planning Robbins 40000 0 0 40000 Programmed
2020 Hanover Park TOD Zoning Code Update TOD Zoning Community Planning Hanover Park 20439 0 0 20439 Completed
2019 Riverside TOD Zoning Code Update TOD Zoning Community Planning Riverside 35000 0 0 35000 In Progress
2018 Bartlett TOD Zoning Update TOD Zoning Community Planning Bartlett 18875 0 0 18875 Completed
2018 Cicero Zoning Code Update TOD Zoning Community Planning Cicero 87410 9712 0 97122 In Progress
2016 Morton Grove TOD Zoning Update TOD Zoning Community Planning Morton Grove 25000 0 0 25000 Completed
2016 Olympia Fields TOD Zoning Update TOD Zoning Community Planning Olympia Fields 25000 0 0 25000 Completed
2015 Forest Park TOD Zoning Code Update (Roosevelt & Harlem) TOD Zoning Community Planning Forest Park 4000 0 16000 20000 Completed
2015 Highwood TOD Zoning Update TOD Zoning Community Planning Highwood 4000 0 16000 20000 Completed
2015 Brookfield TOD Zoning Update TOD Zoning Community Planning Brookfield 4000 0 16000 20000 Completed
2015 Evanston TOD Parking Regulations Update TOD Zoning Community Planning Evanston 5000 0 20000 25000 Completed
2014 Geneva TOD Zoning Update TOD Zoning Community Planning Geneva 4000 0 16000 20000 Completed
2013 Franklin Park Zoning Code Update TOD Zoning Community Planning Franklin Park 4334 0 17332 21666 Completed
2013 Winthrop Harbor TOD Zoning Code Update TOD Zoning Community Planning Winthrop Harbor 4334 0 17332 21666 Completed
2013 Northbrook TOD Zoning Code Update TOD Zoning Community Planning Northbrook 4334 0 17332 21666 Completed
2012 Buffalo Grove TOD Zoning Code Update TOD Zoning Community Planning Buffalo Grove 4334 0 17332 21666 Completed
2012 Wilmette TOD Zoning Code Update (Parking) TOD Zoning Community Planning Wilmette 2000 0 8000 10000 Completed
2012 Villa Park TOD Zoning Code Update TOD Zoning Community Planning Villa Park 4334 0 17332 21666 Completed
2011 Manhattan TOD Zoning Code Update TOD Zoning Community Planning Manhattan 21666 0 0 21666 Completed
2011 Prairie Grove TOD Zoning Code Update TOD Zoning Community Planning Prairie Grove 21666 0 0 21666 Completed
2011 Blue Island TOD Zoning Code Update TOD Zoning Community Planning Blue Island 21666 0 0 21666 Completed
2020 CTA Bus Priority Zones Plan - Halsted Street Transit Improvement Plan Community Planning Chicago Transit Authority (CTA) 150000 150000 0 300000 In Progress
2020 DuPage County Mobility Plan Transit Improvement Plan Community Planning DuPage County 75901 18975 0 94876 In Progress
2019 Pace I-294 Tri-State Market and Facilities Feasibility Study Transit Improvement Plan Community Planning Pace Suburban Bus 0 47619 190476 238095 Completed
2019 Metra Station Evaluation Transit Improvement Plan Community Planning Metra 52000 13000 0 65000 Completed
2018 North Central Service Analysis and Implementation Study Transit Improvement Plan Community Planning Mundelein 50000 25000 50000 125000 Completed
2016 DuPage Last Mile Transit Planning Study Transit Improvement Plan Community Planning DuPage County Division of Transportation 0 0 0 0 Completed
2015 Mount Prospect Rand Road Corridor Plan Transit Improvement Plan Community Planning Mount Prospect 100000 25000 0 125000 Completed
2015 Pace Local Transit Planning For Hoffman Estates, Waukegan and Woodridge Transit Improvement Plan Community Planning Pace Suburban Bus 0 30000 120000 150000 Completed
2015 Aurora Station Boulevard Transit Plan Update Transit Improvement Plan Community Planning Aurora 0 0 0 0 Completed
2014 Kane County Ride-in-Kane Assessment Transit Improvement Plan Community Planning Kane County DOT 0 15000 60000 75000 Completed
2013 Pace Fox Valley Study Transit Improvement Plan Community Planning Pace Suburban Bus 80000 20000 0 100000 Completed
2012 Village of Carpentersville Transit Improvement Plan Transit Improvement Plan Community Planning Carpentersville 59983 14996 0 74979 Completed
2012 Kenilworth Corridor Transportation and Streetscape Plan Transit Improvement Plan Community Planning Kenilworth 59999 15000 0 74999 Completed
2011 Rolling Meadows Golf Road Transit and Pedestrian Mobility Study Transit Improvement Plan Community Planning Rolling Meadows 71008 17752 0 88760 Completed
2011 Hoffman Estates Flexible Transit Service Operations Transit Improvement Plan Community Planning Hoffman Estates 64000 16000 0 80000 Completed
2011 Naperville Metra Station Bus Depot and Commuter Access Feasibility Study Transit Improvement Plan Community Planning Naperville 63327 15832 0 79159 Completed
2011 Cicero Avenue Corridor Plan Transit Improvement Plan Community Planning Southwest Conference of Mayors 160000 40000 0 200000 Completed
2011 McHenry County Services Restructuring Study Transit Improvement Plan Community Planning McHenry County 119997 29999 0 149996 Completed
2010 Pace Transit Signal Priority Planning for the Milwaukee Avenue Arterial Rapid Transit Transit Improvement Plan Community Planning Pace Suburban Bus 94642 23660 0 118302 Completed
2010 Chicago South Lakefront Corridor Transit Study Transit Improvement Plan Community Planning Chicago 359956 89989 0 449945 Completed
2010 South Elgin Transit Improvement Plan Transit Improvement Plan Community Planning South Elgin 60000 15000 0 75000 Completed
2010 Hanover Park - County Farm Road Transit Service Study Transit Improvement Plan Community Planning Hanover Park 120000 30000 0 150000 Completed
2009 Kane County LRP Transit Component Transit Improvement Plan Community Planning Kane County 80000 39738 0 119738 Completed
2009 DuPage County Transit Plan Update Transit Improvement Plan Community Planning DuPage County 50000 68533 0 118533 Completed
2009 Schaumburg Transit Service Assessment Transit Improvement Plan Community Planning Schaumburg 80000 20000 0 100000 Completed
2009 Joliet Intermodal Transportation Center Feasibility Study Transit Improvement Plan Community Planning Joliet 100000 25000 0 125000 Completed
2009 Southwest Will TMA Study Transit Improvement Plan Community Planning Joliet Arsenal Development Authority 100000 25000 0 125000 Completed
2009 Will County Coordinated Paratransit Study Transit Improvement Plan Community Planning Will County 79996 19999 0 99995 Completed
2009 Pace I-355 Express Bus Transit Improvement Plan Community Planning Pace Suburban Bus 212787 53197 0 265984 Completed
2009 St. Charles Circulator Feasibility Study Transit Improvement Plan Community Planning St. Charles 79428 19857 0 99285 Completed
2007 Greater Roseland (Chicago) Transit-Linked Community Development Project Transit Improvement Plan Community Planning Developing Communities Project (DCP) 30000 0 120000 150000 Completed
2007 Lake County Inter/Intra County Paratransit Transportation Study Transit Improvement Plan Community Planning Lake County 0 19322 77289 96611 Completed
2007 Addison Advantage Transit Improvements Transit Improvement Plan Community Planning Addison 0 20000 80000 100000 Completed
2007 Lake Forest: Forest Green Transit Study Transit Improvement Plan Community Planning Lake Forest 80000 20000 0 100000 Completed
2007 Evanston Multi-Modal Master Transportation Plan Transit Improvement Plan Community Planning Evanston 0 80000 20000 100000 Completed
2006 South Suburban Commuter Rail Corridor Phase I & II Transit Improvement Plan Community Planning South Suburban Mayors and Managers Association (SSMMA) 76811 241300 0 318111 Completed
2006 Pace Service Planning Tool Transit Improvement Plan Community Planning Pace Suburban Bus 250000 802570 0 1052570 Completed
2005 Justice Transit Improvement Study Transit Improvement Plan Community Planning Justice 6741 6741 53928 67410 Completed
2005 Melrose Park Lake Street Transit Improvement Plan Transit Improvement Plan Community Planning Melrose Park 0 15770 63080 78850 Completed
2005 Orland Park LaGrange Road Transit Improvement Plan Transit Improvement Plan Community Planning Orland Park 0 19971 79884 99855 Completed
2005 Naperville Circulator Implementation Plan Transit Improvement Plan Community Planning Naperville 65634 16409 0 82043 Completed
2004 Skokie and Evanston: Skokie Swift Corridor Travel Market Analysis Transit Improvement Plan Community Planning Evanston/Skokie 120000 30000 0 150000 Completed
2004 DuPage Phase I Community Circulators Transit Improvement Plan Community Planning DuPage Mayors & Managers 140151 30000 0 170151 Completed
2003 Cook-DuPage Corridor Study Transit Improvement Plan Community Planning Regional Transportation Authority (RTA) 1039789 0 578211 1618000 Completed
2003 Pace Market Feasibility Study for North Central Shuttle Service Transit Improvement Plan Community Planning Pace Suburban Bus 15083 0 60334 75417 Completed
2001 Lake County 2020 Transportation Plan: Transit Component Transit Improvement Plan Community Planning Lake County 0 0 0 0 Completed
2000 Joliet Arsenal Area Transportation Plan Transit Improvement Plan Community Planning Joliet Arsenal Development Authority 20000 90000 80000 190000 Completed
2000 McHenry County Transportation Plan: Transit Component Transit Improvement Plan Community Planning McHenry County 0 0 0 0 Completed
2000 Inner and Outer Circumferential Rail Corridors Feasibility Study Transit Improvement Plan Community Planning Metra 30755 51464 106502 188721 Completed
2000 Skokie Swift Station Location Feasibility Study Transit Improvement Plan Community Planning Skokie 39912 39971 80000 159883 Completed
1999 Kane County Transit Opportunity Assessment Transit Improvement Plan Community Planning Kane County 0 16736 27000 43736 Completed
1999 Lake County Route 60 and Route 22 Corridor Shuttle Study Transit Improvement Plan Community Planning TMA of Lake Cook 45000 0 0 45000 Completed
1999 DuPage Area Transit Plan Transit Improvement Plan Community Planning DuPage Mayors & Managers 150778 0 126467 277245 Completed
1998 Northwest Corridor Study Transit Improvement Plan Community Planning Northwest Municipal Conference 346487 298974 484000 1129461 Completed
2022 Homewood Downtown TOD Plan Transit-Oriented Development Plan Community Planning Homewood 114750 20250 0 135000 Programmed
2020 Elburn TOD Plan Transit-Oriented Development Plan Community Planning Elburn 106173 18736 0 124909 Completed
2019 Crystal Lake TOD Planning Study Transit-Oriented Development Plan Community Planning Crystal Lake 199956 29989 0 229945 Completed
2019 Itasca Downtown Strategic Action Plan Update Transit-Oriented Development Plan Community Planning Itasca 72623 18156 0 90779 Completed
2019 Cary Downtown Strategic Plan Transit-Oriented Development Plan Community Planning Cary 0 21449 85797 107246 Completed
2019 Elevated Chicago Action Plans Transit-Oriented Development Plan Community Planning Elevated Chicago 80000 20000 0 100000 In Progress
2018 Robbins TOD Plan Update Transit-Oriented Development Plan Community Planning Robbins 25000 0 0 25000 In Progress
2018 Maywood TOD Plan Update Transit-Oriented Development Plan Community Planning Maywood 11762 3250 50000 65012 Completed
2016 Chicago - Jefferson Park Station Area Master Plan Transit-Oriented Development Plan Community Planning Chicago 20000 25000 80000 125000 Completed
2015 Bartlett Downtown / TOD Plan Transit-Oriented Development Plan Community Planning Bartlett 0 24985 99940 124925 Completed
2015 Libertyville TOD Plan Transit-Oriented Development Plan Community Planning Libertyville 80000 20000 0 100000 Completed
2015 Palatine TOD Plan Transit-Oriented Development Plan Community Planning Palatine 79994 19999 0 99993 Completed
2015 Worth TOD Plan Transit-Oriented Development Plan Community Planning Worth 19955 14966 39909 74830 Completed
2013 City of Chicago Ashland-Western Bus Rapid Transit Land Use Development Plan Transit-Oriented Development Plan Community Planning Chicago 160000 40000 0 200000 Completed
2013 Highwood Transit-Oriented Development Plan Transit-Oriented Development Plan Community Planning Highwood 100000 25000 0 125000 Completed
2013 City of Chicago Metra Station Area Typology Study Transit-Oriented Development Plan Community Planning Chicago 100000 25000 0 125000 Completed
2013 River Grove Thatcher Avenue TOD Transit-Oriented Development Plan Community Planning River Grove 60000 15000 0 75000 Completed
2012 Westmont TOD Zoning Code Update Transit-Oriented Development Plan Community Planning Westmont 4334 0 17332 21666 Completed
2012 Cicero Connections Initiative Transit-Oriented Development Plan Community Planning Cicero 118503 29626 0 148129 Completed
2012 Fox Lake Station Area Plan Transit-Oriented Development Plan Community Planning Fox Lake 80000 20000 0 100000 Completed
2012 Evanston Main Street Station Transit-Oriented Development Plan Transit-Oriented Development Plan Community Planning Evanston 100000 25000 0 125000 Completed
2012 Lake Villa Downtown TOD Plan Transit-Oriented Development Plan Community Planning Lake Villa 99872 24968 0 124840 Completed
2012 Mount Prospect Downtown Implementation Plan Transit-Oriented Development Plan Community Planning Mount Prospect 78876 19719 0 98595 Completed
2011 Elgin Chicago Street Station Area Plan Transit-Oriented Development Plan Community Planning Elgin 80000 20000 0 100000 Completed
2011 Romeoville East Side Plan Transit-Oriented Development Plan Community Planning Romeoville 79960 19990 0 99950 Completed
2011 Northbrook Downtown Station Area Plan Transit-Oriented Development Plan Community Planning Northbrook 99604 24901 0 124505 Completed
2011 Chicago Southland TOD Corridor Planning Study Phase II Implementation Transit-Oriented Development Plan Community Planning South Suburban Mayors and Managers Association (SSMMA) 100000 25000 0 125000 Completed
2011 Hanover Park Village Center Transit-Oriented Development (TOD) Transit-Oriented Development Plan Community Planning Hanover Park 80000 20000 0 100000 Completed
2010 Skokie-Dempster Station Area Plan Transit-Oriented Development Plan Community Planning Skokie 99768 24942 0 124710 Completed
2010 Clarendon Hills Train Station Redevelopment Phase I Implementation Transit-Oriented Development Plan Community Planning Clarendon Hills 79984 19996 0 99980 Completed
2010 Chicago Washington Park 63rd Street Corridor TOD Study Transit-Oriented Development Plan Community Planning Chicago 119983 29996 0 149979 Completed
2010 Lombard Downtown Implementation Study Transit-Oriented Development Plan Community Planning Lombard 100000 25000 0 125000 Completed
2010 Geneva Downtown / Station Area Master Plan Transit-Oriented Development Plan Community Planning Geneva 99265 24816 0 124081 Completed
2009 Des Plaines Cumberland Transit-Oriented Development Plan Transit-Oriented Development Plan Community Planning Des Plaines 83550 0 41152 124702 Completed
2009 Prairie Grove Town Center and TOD Development Plan Transit-Oriented Development Plan Community Planning Prairie Grove 94734 23684 0 118418 Completed
2009 East Dundee: Dundee Crossing Transit Center Transit-Oriented Development Plan Community Planning East Dundee 79816 19954 0 99770 Completed
2009 Antioch Downtown Land Use and Transit Implementation Strategy Transit-Oriented Development Plan Community Planning Antioch 79766 19942 0 99708 Completed
2009 Chicago - Metra Milwaukee District West Line Transit-Friendly Development Plan Transit-Oriented Development Plan Community Planning Chicago 175698 43924 0 219622 Completed
2009 Glenwood Station Area Study Transit-Oriented Development Plan Community Planning Glenwood 73400 18350 0 91750 Completed
2009 Western Springs Downtown Plan Transit-Oriented Development Plan Community Planning Western Springs 95984 23996 0 119980 Completed
2009 Manhattan Village Center Transit-Oriented Development Plan Community Planning Manhattan 100000 25018 0 125018 Completed
2009 Bensenville Transit Improvement Plan and Station Area Study Transit-Oriented Development Plan Community Planning Bensenville 98504 24626 0 123130 Completed
2009 Chicago Southland Transit Region Transit-Oriented Development Plan Community Planning South Suburban Mayors and Managers Association (SSMMA) 140000 35000 0 175000 Completed
2009 Wilmette Village Center Master Plan Transit-Oriented Development Plan Community Planning Wilmette 99302 24826 0 124128 Completed
2007 Marengo Station Area Plan Transit-Oriented Development Plan Community Planning Marengo 0 19948 79792 99740 Completed
2007 Plainfield STAR Line Transit-Oriented Development District Plan Transit-Oriented Development Plan Community Planning Plainfield 0 24625 98498 123123 Completed
2007 South Chicago Heights Station Area Plan Transit-Oriented Development Plan Community Planning South Chicago Heights 0 19931 79724 99655 Completed
2007 Chicago Transit-Friendly Development at CTA Stations Transit-Oriented Development Plan Community Planning Chicago 200000 50000 0 250000 Completed
2007 Huntley Transit-Oriented Development Guidelines Transit-Oriented Development Plan Community Planning Huntley 0 21103 84410 105513 Completed
2007 Chicago Heights Station Area Plan Transit-Oriented Development Plan Community Planning Chicago Heights 0 19915 79660 99575 Completed
2006 Montgomery Park and Ride Facility Plan Transit-Oriented Development Plan Community Planning Montgomery 80000 32496 0 112496 Completed
2006 Crete Downtown and Balmoral Park Station Area Plans Transit-Oriented Development Plan Community Planning Crete 2770 20000 91080 113850 Completed
2006 Winfield Town Center Revitalization Plan Transit-Oriented Development Plan Community Planning Winfield 938 20000 83750 104688 Completed
2006 Elgin National Street Station Area Plan Transit-Oriented Development Plan Community Planning Elgin 0 20000 80000 100000 Completed
2006 Berwyn Transit-Oriented Master Plan Transit-Oriented Development Plan Community Planning Berwyn 19078 0 76313 95391 Completed
2005 Buffalo Grove Transit-Oriented Development Plan Transit-Oriented Development Plan Community Planning Buffalo Grove 12443 12443 99541 124427 Completed
2005 Bellwood Transit Oriented-Development Plan Transit-Oriented Development Plan Community Planning Bellwood 0 20771 83084 103855 Completed
2005 Villa Park Station Area Plan Transit-Oriented Development Plan Community Planning Villa Park 0 15577 62310 77887 Completed
2005 Elmwood Park Station Area Plan Transit-Oriented Development Plan Community Planning Elmwood Park 0 19023 76094 95117 Completed
2005 Mokena Transit-Oriented Development Plan Transit-Oriented Development Plan Community Planning Mokena 4900 20000 99600 124500 Completed
2004 Park Forest Metra Electric District 211th Street Station Area Plan Transit-Oriented Development Plan Community Planning Park Forest 10200 9800 80000 100000 Completed
2004 Wood Dale Station Area Plan Transit-Oriented Development Plan Community Planning Wood Dale 0 18340 73360 91700 Completed
2004 Midlothian Station Area Enhancement Transit-Oriented Development Plan Community Planning Midlothian 60000 0 80000 140000 Completed
2004 Harvey Intermodal Station Area Plan Transit-Oriented Development Plan Community Planning Harvey 16739 0 66954 83693 Completed
2003 New Lenox Station Area Plan Transit-Oriented Development Plan Community Planning New Lenox 0 24326 97303 121629 Completed
2003 Mundelein Station Area Plan Transit-Oriented Development Plan Community Planning Mundelein 0 18568 60000 78568 Completed
2003 Riverside Central Business District Station Area Plan Transit-Oriented Development Plan Community Planning Riverside 0 15000 60000 75000 Completed
2003 Oak Park Intermodal Station Area Plan Transit-Oriented Development Plan Community Planning Oak Park 0 181518 60000 241518 Completed
2003 Winthrop Harbor Station Area Plan Transit-Oriented Development Plan Community Planning Winthrop Harbor 0 14440 57760 72200 Completed
2003 La Grange Comprehensive Plan Update and BNSF Corridor Plan Transit-Oriented Development Plan Community Planning La Grange 0 65000 60000 125000 Completed
2002 North Chicago Station Area Planning Study Transit-Oriented Development Plan Community Planning North Chicago 0 14964 59856 74820 Completed
2002 Wheeling Station Area Planning Study Transit-Oriented Development Plan Community Planning Wheeling 0 15000 60000 75000 Completed
2002 Lemont Station Area Planning Study Transit-Oriented Development Plan Community Planning Lemont 0 20000 80000 100000 Completed
2002 Franklin Park West Line Station Area Planning Study Transit-Oriented Development Plan Community Planning Franklin Park 0 15000 60000 75000 Completed
2002 Richton Park Station Area Planning Study Transit-Oriented Development Plan Community Planning Richton Park 10042 7500 70168 87710 Completed
2001 Fox River Grove Downtown Redevelopment Plan Transit-Oriented Development Plan Community Planning Fox River Grove 0 14500 58000 72500 Completed
2001 Maywood Station Area Planning Study Transit-Oriented Development Plan Community Planning Maywood 17620 0 70748 88368 Completed
2001 Woodstock Transit-Oriented Development Study Transit-Oriented Development Plan Community Planning Woodstock 0 13500 54000 67500 Completed
2000 Riverdale 138th Street Station Planning Study Transit-Oriented Development Plan Community Planning Riverdale 9700 0 38800 48500 Completed
2000 Robbins Metra Station Transit-Oriented Development Study Transit-Oriented Development Plan Community Planning Robbins 11400 0 45600 57000 Completed
2000 Hazel Crest 170th Street Station Transit-Oriented Development Planning Study Transit-Oriented Development Plan Community Planning Hazel Crest 11000 0 44000 55000 Completed
2000 Morton Grove Commuter Station Location Analysis Transit-Oriented Development Plan Community Planning Morton Grove 50000 49500 0 99500 Completed
2000 University Park Transit-Oriented Development Planning Study Transit-Oriented Development Plan Community Planning University Park 0 14987 59946 74933 Completed
1999 Waukegan Intermodal Transit Facility Study Transit-Oriented Development Plan Community Planning Waukegan 15000 40000 60000 115000 Completed
1999 Elmhurst Downtown Plan Transit-Oriented Development Plan Community Planning Elmhurst 7500 0 0 7500 Completed
1999 Evanston Transportation Center Planning Study Transit-Oriented Development Plan Community Planning Evanston 69447 29763 0 99210 Completed
1999 Westmont Transit-Oriented Development Opportunity Study Transit-Oriented Development Plan Community Planning Westmont 20000 0 20000 40000 Completed
1999 Orland Park Transit-Oriented Development Planning Study Transit-Oriented Development Plan Community Planning Orland Park 30000 20000 0 50000 Completed
1999 Blue Island Transit-Oriented Development Transit-Oriented Development Plan Community Planning Blue Island 22200 0 0 22200 Completed
1999 Olympia Fields Town Center Development Plan Transit-Oriented Development Plan Community Planning Olympia Fields 37949 0 0 37949 Completed
1998 Tinley Park Station Area Plans Transit-Oriented Development Plan Community Planning Tinley Park 40000 0 0 40000 Completed
2007 Mount Prospect Public Transportation System Plan Transit-Oriented Development Plan - Transit Improvement Plan Community Planning Mount Prospect 0 24959 99836 124795 Completed
2006 Chicago--Reconnecting Neighborhoods Transit-Oriented Development Plan - Transit Improvement Plan Community Planning Chicago 51243 53446 118757 223446 Completed
2018 Main Line Conversion to LED Capital Innovation, Coordination, and Enhancement (ICE) Metra 952594 0 0 952594 In Progress
2018 Downtown Terminal Information Display Capital Innovation, Coordination, and Enhancement (ICE) Metra 952500 0 0 952500 Programmed
2018 GPS Train Tracker Capital Innovation, Coordination, and Enhancement (ICE) Metra 3000000 0 0 3000000 Programmed
2018 Intelligent Bus System (IBS) Equipment - 2018 Capital Innovation, Coordination, and Enhancement (ICE) Pace Suburban Bus 1635000 0 0 1635000 In Progress
2017 Car and Locomotive Cameras Capital Innovation, Coordination, and Enhancement (ICE) Metra 1500000 0 0 1500000 Programmed
2017 Revenue Accounting System Capital Innovation, Coordination, and Enhancement (ICE) Metra 1930000 0 0 1930000 In Progress
2017 Vehicle Inspection System Capital Innovation, Coordination, and Enhancement (ICE) Metra 1000000 0 0 1000000 Programmed
2017 Intelligent Bus System (IBS) Equipment - 2017 Capital Innovation, Coordination, and Enhancement (ICE) Pace Suburban Bus 1660000 0 0 1660000 In Progress
2017 Luminous Platform Signs at Demonstration Locations Capital Innovation, Coordination, and Enhancement (ICE) Metra 550000 0 0 550000 Programmed
2016 Crew Optimization System Capital Innovation, Coordination, and Enhancement (ICE) Metra 500000 0 0 500000 Programmed
2016 Control Center - Business Continuity and Disaster Recovery Implementation Capital Innovation, Coordination, and Enhancement (ICE) Chicago Transit Authority (CTA) 500000 0 0 500000 In Progress
2016 Software and Hardware Enhancements to Improve Efficiency Capital Innovation, Coordination, and Enhancement (ICE) Chicago Transit Authority (CTA) 1409000 0 0 1409000 In Progress
2016 Mobile Application Support Activities Capital Innovation, Coordination, and Enhancement (ICE) Metra 2500000 0 0 2500000 Programmed
2016 Platform Heating Technology Capital Innovation, Coordination, and Enhancement (ICE) Metra 742000 0 0 742000 In Progress
2016 Origin - Destination Model Update and Survey Capital Innovation, Coordination, and Enhancement (ICE) Chicago Transit Authority (CTA) 500000 0 0 500000 In Progress
2016 Automatic Passenger Counter Capital Innovation, Coordination, and Enhancement (ICE) Metra 1000000 0 0 1000000 Programmed
2016 Intelligent Bus System (IBS) Equipment - 2016 Capital Innovation, Coordination, and Enhancement (ICE) Pace Suburban Bus 1635452 0 0 1635452 In Progress
2016 Information Technology Project Implementation Capital Innovation, Coordination, and Enhancement (ICE) Chicago Transit Authority (CTA) 1200000 0 0 1200000 In Progress
2016 Facilities and Vehicle Maintenance Improvements and Efficiencies Capital Innovation, Coordination, and Enhancement (ICE) Chicago Transit Authority (CTA) 1137000 0 0 1137000 In Progress
2015 Passenger Information: Signs and Announcements Capital Innovation, Coordination, and Enhancement (ICE) Metra 2725800 0 0 2725800 In Progress
2015 Ventra Base Component Fee Capital Innovation, Coordination, and Enhancement (ICE) Pace Suburban Bus 1200000 0 0 1200000 Completed
2015 Electronic Crew Calling Capital Innovation, Coordination, and Enhancement (ICE) Metra 1913356 0 0 1913356 In Progress
2015 Ventra Vending Machines Capital Innovation, Coordination, and Enhancement (ICE) Pace Suburban Bus 810000 0 0 810000 Completed
2015 Software and Hardware Enhancements Capital Innovation, Coordination, and Enhancement (ICE) Chicago Transit Authority (CTA) 6609893 0 0 6609893 In Progress
2015 Automated Field IT System Capital Innovation, Coordination, and Enhancement (ICE) Metra 3500000 0 0 3500000 In Progress
2015 Video Enhancement for Bus and Rail Capital Innovation, Coordination, and Enhancement (ICE) Chicago Transit Authority (CTA) 8007280 0 0 8007280 In Progress
2015 Mobile Application Development Capital Innovation, Coordination, and Enhancement (ICE) Pace Suburban Bus 300000 0 0 300000 In Progress
2015 Communications Equipment and Outreach Capital Innovation, Coordination, and Enhancement (ICE) Chicago Transit Authority (CTA) 317120 0 0 317120 Completed
2015 Ventra Implementation Improvements Capital Innovation, Coordination, and Enhancement (ICE) Chicago Transit Authority (CTA) 2378400 0 0 2378400 In Progress
2015 Mobile Application Capital Innovation, Coordination, and Enhancement (ICE) Metra 4371936 0 0 4371936 In Progress
2015 Hybrid Fuel Vehicles Capital Innovation, Coordination, and Enhancement (ICE) Metra 1003419 0 0 1003419 Completed
2013 120V AC Outlets for Passenger Use Capital Innovation, Coordination, and Enhancement (ICE) Metra 720000 180000 0 900000 In Progress
2013 Regional Fare Solution Technologies Capital Innovation, Coordination, and Enhancement (ICE) Metra 1440000 360000 0 1800000 In Progress
2013 Shuttle Bug Operations Capital Innovation, Coordination, and Enhancement (ICE) Regional Transportation Authority (RTA) 1200000 0 0 1200000 In Progress
2013 Market Development Activities Capital Innovation, Coordination, and Enhancement (ICE) Regional Transportation Authority (RTA) 1000000 0 0 1000000 In Progress
2012 Bus Pad Installation Capital Innovation, Coordination, and Enhancement (ICE) Pace Suburban Bus 78508 19927 0 98435 Completed
2012 Regional Transit Fare System Program Management and Systems Integration Capital Innovation, Coordination, and Enhancement (ICE) Metra 1600000 400000 0 2000000 In Progress
2012 Advanced Paging System Capital Innovation, Coordination, and Enhancement (ICE) Chicago Transit Authority (CTA) 2493307 623327 0 3116634 Completed
2012 Rail Traffic Control (RTC) Program Capital Innovation, Coordination, and Enhancement (ICE) Metra 40472 10118 0 50590 Completed
2012 Automatic External Defibrillators (AEDs) Capital Innovation, Coordination, and Enhancement (ICE) Metra 639800 159950 0 799750 Completed
2012 Maintenance Management Information System: Enterprise Asset Management Capital Innovation, Coordination, and Enhancement (ICE) Chicago Transit Authority (CTA) 992875 248219 0 1241094 In Progress
2012 Visual Information System (VIS) Installation Capital Innovation, Coordination, and Enhancement (ICE) Metra 691913 172978 0 864891 In Progress
2012 Real Time Link to Schedules and Next Bus Capital Innovation, Coordination, and Enhancement (ICE) Pace Suburban Bus 60559 15140 0 75699 Completed
2012 Real Time Signage Capital Innovation, Coordination, and Enhancement (ICE) Pace Suburban Bus 1280000 320000 963000 2563000 In Progress
2012 Customer Information Displays Capital Innovation, Coordination, and Enhancement (ICE) Chicago Transit Authority (CTA) 2000000 500000 0 2500000 Completed
2012 Blue Island/Vermont Street Interagency Transfer Improvements Capital Innovation, Coordination, and Enhancement (ICE) Metra 2000000 500000 0 2500000 In Progress
2012 Paratransit Command Center Capital Innovation, Coordination, and Enhancement (ICE) Pace Suburban Bus 272647 68162 0 340809 Completed
2012 Maintenance Management Information System: Modules and Upgrade Project Capital Innovation, Coordination, and Enhancement (ICE) Chicago Transit Authority (CTA) 2150577 537644 0 2688221 In Progress
2012 Train Station Customer Upgrades Capital Innovation, Coordination, and Enhancement (ICE) Chicago Transit Authority (CTA) 1023700 255925 0 1279625 Completed
2012 Real Time Interface for Train Tracker Capital Innovation, Coordination, and Enhancement (ICE) Metra 64000 16000 0 80000 Completed
2011 Milwaukee Avenue Transit Signal Priority Demonstration Project Capital Innovation, Coordination, and Enhancement (ICE) Pace Suburban Bus 254343 63586 0 317929 In Progress
2009 Automatic Bay Reading System (ABRS) for Bus Garages Capital Innovation, Coordination, and Enhancement (ICE) Chicago Transit Authority (CTA) 1280000 320000 0 1600000 Completed
2009 Real-Time Arrival Information for Bus Stop Signs Capital Innovation, Coordination, and Enhancement (ICE) Chicago Transit Authority (CTA) 5296973 1324243 0 6621216 In Progress
2009 Bike-Transit Integration at Chicago CTA and Metra Stations Capital Innovation, Coordination, and Enhancement (ICE) Chicago DOT 188702 47176 0 235878 Completed
2009 Skokie Swift Oakton Street Station Area Improvement Capital Innovation, Coordination, and Enhancement (ICE) Skokie 1297389 324347 0 1621736 Completed
2009 Dispatching with Mobile Computers and In-Vehicle Technology Capital Innovation, Coordination, and Enhancement (ICE) Rich Township 139694 44000 0 183694 Completed
2018 South Side Service Improvements - 2018 Operating Innovation, Coordination, and Enhancement (ICE) Chicago Transit Authority (CTA) 6037270 0 0 6037270 Programmed
2017 South Side Service Improvements - 2017 Operating Innovation, Coordination, and Enhancement (ICE) Chicago Transit Authority (CTA) 6329515 0 0 6329515 Completed
2016 Reinstating the Ashland and Western Express Routes Operating Innovation, Coordination, and Enhancement (ICE) Chicago Transit Authority (CTA) 1091000 0 0 1091000 In Progress
2015 Metra Special Events Service Operating Innovation, Coordination, and Enhancement (ICE) Metra 356581 0 0 356581 In Progress
2015 Rock Island Line Enhancement Operating Innovation, Coordination, and Enhancement (ICE) Metra 819000 0 0 819000 Completed
2015 Pace Service Enhancements 2015 Operating Innovation, Coordination, and Enhancement (ICE) Pace Suburban Bus 2133000 0 0 2133000 Completed
2009 PACE ADA / Paratranist Operations Operating Innovation, Coordination, and Enhancement (ICE) Pace Suburban Bus 11874621 0 0 11874621 Completed
2009 CTA Service Improvements - 2009 Operating Innovation, Coordination, and Enhancement (ICE) Chicago Transit Authority (CTA) 160000 40000 0 200000 Completed
2009 Southwest Service Saturday Service Operating Innovation, Coordination, and Enhancement (ICE) Metra 332206 332206 0 664412 Completed
2009 I-355 Corridor Development Project Operating Innovation, Coordination, and Enhancement (ICE) Pace Suburban Bus 53995 53995 0 107990 Completed
2009 I-55 Corridor Enhancement Project Operating Innovation, Coordination, and Enhancement (ICE) Pace Suburban Bus 226600 226600 0 453200 Completed
2009 Lake County Northwest Circulator Operating Innovation, Coordination, and Enhancement (ICE) Lake County 260930 261000 0 521930 Completed
2009 CTA Operations Operating Innovation, Coordination, and Enhancement (ICE) Chicago Transit Authority (CTA) 5000000 0 0 5000000 Completed
2021 Volunteer Express '13-14 Administration - Operating Section 5310 / JARC / NF Hanover Township 0 0 4800 4800 Completed
2019 Ride in Kane Phase 17 & 18 Administration - Operating Section 5310 / JARC / NF Association for Individual Development (AID) 0 2497996 2502996 5000992 Programmed
2012 Volunteer Express '12 Administration - Operating Section 5310 / JARC / NF Hanover Township 0 0 12969 12969 Completed
2012 Ways to Work '12 Administration - Operating Section 5310 / JARC / NF Salvation Army Family & Community Services 0 317541 384432 701973 Completed
2012 Ride in Kane Phase 9 & 10 Administration - Operating - Mobility Management Section 5310 / JARC / NF Association for Individual Development (AID) 0 2761713 2851898 5613611 In Progress
2021 McHenry County Service Integration & Coordination_'20-'21 Capital Section 5310 / JARC / NF McHenry County 0 20000 80000 100000 Programmed
2021 CTF Illinois Transportation Services for People with Disabilities_'20-'21 Capital Section 5310 / JARC / NF CTF Illinois 0 1319 5276 6595 Programmed
2016 Tactile Signage at CTA Bus Stops Capital Section 5310 / JARC / NF Chicago Transit Authority (CTA) 0 95087 380350 475437 In Progress
2015 Little City Transportation Program '15 Capital Section 5310 / JARC / NF Little City Foundation 0 223780 223780 447560 Completed
2013 Metra Visual Information Systems (VIS) at Non-key ADA Metra Stations Capital Section 5310 / JARC / NF Metra 0 75000 300000 375000 Completed
2013 City of Chicago Taxi Wheelchair Accessible Vehicle Cost Reimbursement Program Capital Section 5310 / JARC / NF Chicago Dept. of Business Affairs & Consumer Protection 0 442923 1771689 2214612 In Progress
2010 Concrete Waiting Areas at Bus Stops Capital Section 5310 / JARC / NF Pace Suburban Bus 0 0 600000 600000 Completed
2021 Kendall Community Transit Program '13-14 Capital - Operating Section 5310 / JARC / NF Kendall County 0 184000 184000 368000 Completed
2010 Ways to Work '10 Capital - Operating Section 5310 / JARC / NF Salvation Army Family & Community Services 0 243854 289934 533788 Completed
2008 Kendall Community Transit Program '08 Capital - Operating Section 5310 / JARC / NF Kendall County 0 387915 512159 900074 Completed
2011 Will County Mobility Management Program '11 Capital - Operating - Mobility Management Section 5310 / JARC / NF Will County 0 386000 506000 892000 Completed
2010 McHenry County Service Integration & Coordination '10 Capital - Operating - Mobility Management Section 5310 / JARC / NF McHenry County 0 790979 805442 1596421 Completed
2021 Ride in Kane Phase 19 & 20 Mobility Management Section 5310 / JARC / NF Kane County 0 40000 160000 200000 Programmed
2021 Kendall Area Transit_'20-'21 Mobility Management Section 5310 / JARC / NF Kendall County 0 7500 30000 37500 Programmed
2021 Will County Will Ride Transportation Services_'20'21 Mobility Management Section 5310 / JARC / NF Will County 0 48000 192000 240000 Programmed
2021 RGA - Transp. Collaborative for Individuals with Development Disabilities Mobility Management Section 5310 / JARC / NF Ray Graham Association 0 59680 238720 298400 Programmed
2021 Phase VIII Regional Call Center '20-'21 Mobility Management Section 5310 / JARC / NF Pace Suburban Bus 0 621099 2484395 3105494 Programmed
2019 Phase VII Regional Call Center '18-'19 Mobility Management Section 5310 / JARC / NF Pace Suburban Bus 0 566491 2265964 2832455 Completed
2017 Phase VI Regional Call Center '16-'17 Mobility Management Section 5310 / JARC / NF Pace Suburban Bus 0 443377 1773508 2216885 Completed
2014 Will County Mobility Management Program '13-14 Mobility Management Section 5310 / JARC / NF Will County 0 16346 65385 81731 Completed
2013 CTA Rail Station Guides for CTA Customers Who are Blind or Visually Impaired Mobility Management Section 5310 / JARC / NF Chicago Transit Authority (CTA) 0 9825 43230 53055 In Progress
2011 RGAs Safety Transportation Training Program '11 Mobility Management Section 5310 / JARC / NF Ray Graham Association 0 15331 61326 76657 Completed
2008 RGAs Safety Transportation Training Program '08 Mobility Management Section 5310 / JARC / NF Ray Graham Association 0 8681 34725 43406 Completed
2008 Pace Regional Call Center Mobility Management Section 5310 / JARC / NF Pace Suburban Bus 0 3409112 13676831 17085943 Completed
2021 Naperville _ Ride DuPage to Work '20-'21 Operating Section 5310 / JARC / NF Naperville 0 600000 600000 1200000 Programmed
2021 Clearbrook - Community Connections for Adults with Disabilities_'20-'21 Operating Section 5310 / JARC / NF Clearbrook 0 200000 200000 400000 In Progress
2021 CTF Illinois Transportation Services for People with Disabilities_'20-'21 Operating Section 5310 / JARC / NF CTF Illinois 0 100000 100000 200000 In Progress
2021 DuPage County Transportation to Work_'20-'21 Operating Section 5310 / JARC / NF DuPage County 0 591000 591000 1182000 In Progress
2021 Kendall Area Transit_'20-'21 Operating Section 5310 / JARC / NF Kendall County 0 320000 320000 640000 In Progress
2021 Little City Transportation to Work '20-'21 Operating Section 5310 / JARC / NF Little City Foundation 0 500000 500000 1000000 In Progress
2021 RGA Comprehensive Transportation Program '20-'21 Operating Section 5310 / JARC / NF Ray Graham Association 0 752000 752000 1504000 Programmed
2021 Will County Will Ride Transportation Services_'20'21 Operating Section 5310 / JARC / NF Will County 0 400000 400000 800000 Programmed
2021 Ride in Kane Phase 19 & 20 Operating Section 5310 / JARC / NF Kane County 0 0 2500000 2500000 Programmed
2021 McHenry County Service Integration & Coordination_'20-'21 Operating Section 5310 / JARC / NF McHenry County 0 1400000 1400000 2800000 In Progress
2019 CTF Illinois - Transportation Services for People with Disabilities '18-'19 Operating Section 5310 / JARC / NF CTF Illinois 0 100000 100000 200000 Completed
2019 RGAs Comprehensive Transportation Program '18-'19 Operating Section 5310 / JARC / NF Ray Graham Association 0 766527 766527 1533054 In Progress
2019 Naperville_Ride DuPage to Work '18-'19 Operating Section 5310 / JARC / NF Naperville 0 660000 660000 1320000 In Progress
2019 Clearbrook - Community Connections for Adults with Disabilities Operating Section 5310 / JARC / NF Clearbrook 0 100000 100000 200000 Completed
2019 Little City Transportation Program '18-'19 Operating Section 5310 / JARC / NF Little City Foundation 0 544097 544097 1088194 Completed
2019 Will Ride '18-19 Operating Section 5310 / JARC / NF Will County 0 160000 160000 320000 Programmed
2019 McHenry County Service Integration & Coordination '18-19 Operating Section 5310 / JARC / NF McHenry County 0 1200000 1200000 2400000 Completed
2019 DuPage County Transportation to Work '18-'19 Operating Section 5310 / JARC / NF DuPage County 0 492000 492000 984000 Completed
2019 Kendall Area Transit_18-'19 Operating Section 5310 / JARC / NF Kendall County 0 320000 320000 640000 Completed
2019 Will County Will Ride Transportation Services_'18-19 Operating Section 5310 / JARC / NF Will County 0 160000 160000 320000 Programmed
2017 Ride Lake County Central Dial-a-Ride '16-17 Operating Section 5310 / JARC / NF Lake County 0 119813 119813 239626 Programmed
2017 Will County Mobility Management Program '16 & '17 Operating Section 5310 / JARC / NF Will County 0 283000 283000 566000 In Progress
2017 RGAs Ensuring Access to the Community '16-17 Operating Section 5310 / JARC / NF Ray Graham Association 0 1358670 1358670 2717340 Completed
2017 Ride in Kane Phase 15 & 16 Operating Section 5310 / JARC / NF Association for Individual Development (AID) 0 1544198 1544198 3088396 In Progress
2017 McHenry County Service Integration & Coordination '16-17 Operating Section 5310 / JARC / NF McHenry County 0 840000 840000 1680000 Completed
2017 Kendall Area Transit '16-17 Operating Section 5310 / JARC / NF Kendall County 0 300000 300000 600000 Completed
2017 DuPage County Transportation to Work '16-17 Operating Section 5310 / JARC / NF DuPage County 0 510862 510862 1021724 Completed
2017 Naperville_Ride DuPage to Work '16-17 Operating Section 5310 / JARC / NF Naperville 0 835692 835692 1671384 Completed
2017 Little City Transportation to Work '16-17 Operating Section 5310 / JARC / NF Little City Foundation 0 460000 460000 920000 Completed
2016 Ride Lake County West '16-17 Operating Section 5310 / JARC / NF Lake County 0 321250 321250 642500 Programmed
2015 Ride Lake County Central Dial-a-Ride '15 Operating Section 5310 / JARC / NF Lake County 0 137602 137602 275204 In Progress
2015 Ride in Kane Phase 13 & 14 Operating Section 5310 / JARC / NF Association for Individual Development (AID) 0 1549462 1549462 3098924 Completed
2015 Transportation to Work '15 Operating Section 5310 / JARC / NF DuPage County 0 321024 321024 642048 Completed
2015 Ride Lake County West '15 Operating Section 5310 / JARC / NF Lake County 0 100985 100985 201970 In Progress
2015 McHenry County Service Integration & Coordination '15 Operating Section 5310 / JARC / NF McHenry County 0 496291 496291 992582 Completed
2015 RGAs Comprehensive Program '15 Operating Section 5310 / JARC / NF Ray Graham Association 0 609692 609692 1219384 Completed
2015 Will County Mobility Management Program '15 Operating Section 5310 / JARC / NF Will County 0 139000 199000 338000 Completed
2015 Kendall Community Transit Program '15 Operating Section 5310 / JARC / NF Kendall County 0 249251 249251 498502 Completed
2015 Naperville/Lisle Partners Ride DuPage to Work '15 Operating Section 5310 / JARC / NF Naperville 0 372026 372026 744052 Completed
2014 Ride Lake County West '13-14 Operating Section 5310 / JARC / NF Lake County 0 177000 177000 354000 Completed
2014 Ride Lake County Central Dial-a-Ride '13-14 Operating Section 5310 / JARC / NF Lake County 0 163975 163975 327950 Completed
2013 Naperville/Lisle Partners Ride DuPage to Work '13-14 Operating Section 5310 / JARC / NF Naperville 0 614100 614100 1228200 Completed
2013 RGAs Comprehensive Program '13-14 Operating Section 5310 / JARC / NF Ray Graham Association 0 474544 474544 949088 Completed
2013 McHenry County Service Integration & Coordination '13-14 Operating Section 5310 / JARC / NF McHenry County 0 600000 600000 1200000 Completed
2013 Transportation to Work '13-14 Operating Section 5310 / JARC / NF DuPage County 0 252000 252000 504000 Completed
2013 Ride in Kane Phase 11 & 12 Operating Section 5310 / JARC / NF Association for Individual Development (AID) 0 575000 2875000 3450000 Completed
2013 Little City Transportation Program '14 Operating Section 5310 / JARC / NF Little City Foundation 0 174175 174176 348351 Completed
2013 Transportation for Adults with Intellectual and Developmental Disabilities Operating Section 5310 / JARC / NF Trinity Services 0 173102 177662 350764 Completed
2012 Naperville/Lisle Partners Ride DuPage to Work '12 Operating Section 5310 / JARC / NF Naperville 0 320911 320911 641822 Completed
2012 Transportation to Work '12 Operating Section 5310 / JARC / NF DuPage County 0 261581 261581 523162 Completed
2011 Operation to Enhance Disabled, Senior, and Regular Transportation in Rural Communities '11 Operating Section 5310 / JARC / NF Washington Township 0 10600 11300 21900 Completed
2011 Volunteer Express '11 Operating Section 5310 / JARC / NF Hanover Township 0 0 15454 15454 Completed
2011 Naperville/Lisle Partners Ride DuPage to Work '11 Operating Section 5310 / JARC / NF Naperville 0 519405 519405 1038810 Completed
2011 Ride Lake County West '11 Operating Section 5310 / JARC / NF Lake County 0 500000 500000 1000000 Completed
2010 Ride to Work Program Operating Section 5310 / JARC / NF Safer Foundation 0 11000 11000 22000 Completed
2010 Transportation to Work '10 Operating Section 5310 / JARC / NF DuPage County 0 225728 225728 451456 Completed
2010 Operation to Enhance Disabled, Senior, and Regular Transportation in Rural Communities '10 Operating Section 5310 / JARC / NF Washington Township 0 22500 24000 46500 Completed
2009 Naperville/Lisle Partners Ride DuPage to Work '09 Operating Section 5310 / JARC / NF Naperville 0 371059 371059 742118 Completed
2009 #44 Wallace/Racine Bus Route Extension and Service Expansion Operating Section 5310 / JARC / NF Chicago Transit Authority (CTA) 0 459769 459769 919538 Programmed
2009 Transportation to Work '09 Operating Section 5310 / JARC / NF DuPage County 0 567621 567621 1135242 Completed
2009 31st Street - New Bus Route Operating Section 5310 / JARC / NF Chicago Transit Authority (CTA) 0 1067659 1067659 2135318 Programmed
2009 #54A North Cicero/Skokie Boulevard - Midday Service Operating Section 5310 / JARC / NF Chicago Transit Authority (CTA) 0 130908 130908 261816 Programmed
2009 #67 67th/69th/71st Street - Bus Route Extension Operating Section 5310 / JARC / NF Chicago Transit Authority (CTA) 0 160372 160372 320744 Completed
2009 East 83rd Street - New Bus Route Operating Section 5310 / JARC / NF Chicago Transit Authority (CTA) 0 1272135 1272135 2544270 Programmed
2009 #1 Indiana/Hyde Park Service Expansion Operating Section 5310 / JARC / NF Chicago Transit Authority (CTA) 0 260000 260000 520000 Programmed
2009 #92 Foster - Late Night Weekend Service Operating Section 5310 / JARC / NF Chicago Transit Authority (CTA) 0 121500 121500 243000 Programmed
2009 Operation to Enhance Disabled, Senior and Regular Transportation in Rural Communities '09 Operating Section 5310 / JARC / NF Washington Township 0 30000 30000 60000 Completed
2008 Transportation to Work '08 Operating Section 5310 / JARC / NF DuPage County 0 265040 265040 530080 Completed
2008 New Clybourn Street Fixed Route Service Operating Section 5310 / JARC / NF Chicago Transit Authority (CTA) 0 2179843 2179843 4359686 Programmed
2008 #53A South Pulaski Operating Section 5310 / JARC / NF Chicago Transit Authority (CTA) 0 255307 255307 510614 Completed
2008 Ride Lake County West '08 Operating Section 5310 / JARC / NF Lake County 0 400000 400000 800000 Completed
2008 #18 16th/18th - Midday Service Operating Section 5310 / JARC / NF Chicago Transit Authority (CTA) 0 464051 464051 928102 Completed
2007 #65 Grand Avenue & #7 Harrison Operating Section 5310 / JARC / NF Chicago Transit Authority (CTA) 0 886000 886000 1772000 Completed
2007 Metra Sunrise Express Operating Section 5310 / JARC / NF Metra 0 429000 429000 858000 Completed
2007 Ride in Kane Phase 1 & 2 Operating Section 5310 / JARC / NF Association for Individual Development (AID) 0 1771134 2399934 4171068 Completed
2007 Route 895 - 95th Street Rosemont/Schaumburg Express (Formerly Route 889-South Suburban Bus Express Bus Network) Operating Section 5310 / JARC / NF Pace Suburban Bus 0 1050000 1050000 2100000 Completed
2021 Pace I-90 Service Expansion Phase I Operating - Mobility Management Section 5310 / JARC / NF Pace Suburban Bus 0 633304 670556 1303860 Completed
2021 Pace Call-N-Ride Operating - Mobility Management Section 5310 / JARC / NF Pace Suburban Bus 0 459783 486828 946611 Programmed
2015 Pace CTA Skokie Swift Willow Road Connector Operating - Mobility Management Section 5310 / JARC / NF Pace Suburban Bus 0 88248 98429 186677 Completed
2011 Ride in Kane Phase 7 & 8 Operating - Mobility Management Section 5310 / JARC / NF Association for Individual Development (AID) 0 2761713 2851898 5613611 Completed
2010 Ride in Kane Phase 5 & 6 Operating - Mobility Management Section 5310 / JARC / NF Association for Individual Development (AID) 0 1268016 1313107 2581123 Completed
2009 Ride in Kane Phase 3 & 4 Operating - Mobility Management Section 5310 / JARC / NF Association for Individual Development (AID) 0 1632327 1690726 3323053 Completed