Project_Year | Project_Name | Project_Type | Program | Grantee | RTA_Funds | Local_Funds | Federal_Funds | Total_Funds | Status |
---|---|---|---|---|---|---|---|---|---|
2022 | Berkeley Access to Bus Route Improvements | Pedestrian Access to Transit | Access to Transit Program | Berkeley | 50000 | 0 | 0 | 50000 | Completed |
2022 | Harvard Bus Stop Access Improvements | Pedestrian Access to Transit | Access to Transit Program | Harvard | 47000 | 0 | 0 | 47000 | Completed |
2022 | University Park Metra Station Access Improvements | Pedestrian Access to Transit | Access to Transit Program | University Park | 50000 | 0 | 0 | 50000 | Completed |
2022 | Sauk Village Pace Bus Route Access Improvements | Pedestrian Access to Transit | Access to Transit Program | Sauk Village | 50000 | 0 | 0 | 50000 | In Progress |
2022 | Calumet Park Pace and Metra Access Improvements | Pedestrian Access to Transit | Access to Transit Program | Calumet Park | 52825 | 0 | 211301 | 264126 | In Progress |
2022 | Evanston Pace and CTA Access Improvements | Pedestrian Access to Transit | Access to Transit Program | Evanston | 30048 | 30048 | 240385 | 300481 | In Progress |
2022 | Franklin Park Pace and Metra Improvements | Pedestrian Access to Transit | Access to Transit Program | Franklin Park | 63169 | 114870 | 712157 | 890196 | In Progress |
2022 | Hoffman Estates Pace Improvements | Pedestrian Access to Transit | Access to Transit Program | Hoffman Estates | 67500 | 67500 | 540000 | 675000 | In Progress |
2022 | Northbrook Pace and Metra Improvements | Pedestrian Access to Transit | Access to Transit Program | Northbrook | 20086 | 20086 | 160691 | 200863 | In Progress |
2022 | Prospect Heights Pace and Metra Improvements | Pedestrian Access to Transit | Access to Transit Program | Prospect Heights | 89347 | 284678 | 1496098 | 1870123 | In Progress |
2020 | North Chicago Pace Bus Route Access Improvements | Pedestrian Access to Transit | Access to Transit Program | North Chicago | 103539 | 0 | 414155 | 517694 | In Progress |
2020 | Park Forest Pace Bus Route and Metra Station Access Improvements | Pedestrian Access to Transit | Access to Transit Program | Park Forest | 46560 | 0 | 186242 | 232802 | Completed |
2020 | Midlothian Metra Station Access Improvements - Part II | Pedestrian Access to Transit | Access to Transit Program | Midlothian | 69100 | 69100 | 552800 | 691000 | In Progress |
2020 | Niles Pace Bus Route Access Improvements | Pedestrian Access to Transit | Access to Transit Program | Niles | 79572 | 79572 | 636577 | 795721 | In Progress |
2020 | Aurora Transportation Center Access Improvements | Pedestrian Access to Transit | Access to Transit Program | Aurora | 99528 | 99528 | 796227 | 995283 | In Progress |
2020 | Blue Island Metra Station Access Improvements | Pedestrian Access to Transit | Access to Transit Program | Blue Island | 93800 | 0 | 375200 | 469000 | In Progress |
2020 | Calumet Park Ashland Metra Station Access Improvements | Pedestrian Access to Transit | Access to Transit Program | Calumet Park | 65858 | 0 | 263433 | 329291 | In Progress |
2018 | Bensenville Metra Station Access Improvements | Pedestrian Access to Transit | Access to Transit Program | Bensenville | 0 | 100000 | 400000 | 500000 | Completed |
2018 | Melrose Park Metra Station and Pace Route Access Improvements | Pedestrian Access to Transit | Access to Transit Program | Melrose Park | 18700 | 56100 | 299200 | 374000 | In Progress |
2018 | Chicago Heights Pace Route Access Improvements | Pedestrian Access to Transit | Access to Transit Program | Chicago Heights | 12492 | 12492 | 99936 | 124920 | In Progress |
2018 | Northlake Pace Route Access Improvements | Pedestrian Access to Transit | Access to Transit Program | Northlake | 11496 | 34488 | 183936 | 229920 | In Progress |
2018 | Brookfield Metra Station Bicycle Parking | Pedestrian Access to Transit | Access to Transit Program | Brookfield | 13857 | 41573 | 221720 | 277150 | Completed |
2018 | Waukegan Metra Station and Pace Route Access Improvements | Pedestrian Access to Transit | Access to Transit Program | Waukegan | 13044 | 39132 | 208704 | 260880 | In Progress |
2016 | Richton Park Metra Station and Pace Route Access Improvements | Pedestrian Access to Transit | Access to Transit Program | Richton Park | 70401 | 0 | 281602 | 352003 | Completed |
2016 | Evanston Main Street Station Bicycle Parking | Pedestrian Access to Transit | Access to Transit Program | Evanston | 14000 | 0 | 56000 | 70000 | Completed |
2016 | University Park Pace Route Access Improvements | Pedestrian Access to Transit | Access to Transit Program | University Park | 98350 | 0 | 393400 | 491750 | Completed |
2016 | Bellwood Pace Route Access Improvements | Pedestrian Access to Transit | Access to Transit Program | Bellwood | 150000 | 0 | 600000 | 750000 | Completed |
2016 | Lake Villa Metra Station Access Improvements | Pedestrian Access to Transit | Access to Transit Program | Lake Villa | 66000 | 0 | 264000 | 330000 | Completed |
2016 | Chicago Ridge Metra Station and Pace Route Access Improvements | Pedestrian Access to Transit | Access to Transit Program | Chicago Ridge | 199647 | 0 | 798592 | 998239 | Completed |
2016 | Oak Forest Metra Station and Pace Route Improvements | Pedestrian Access to Transit | Access to Transit Program | Oak Forest | 112977 | 0 | 451910 | 564887 | In Progress |
2016 | Mount Prospect Metra Station Bicycle Parking | Pedestrian Access to Transit | Access to Transit Program | Mount Prospect | 33700 | 0 | 134800 | 168500 | Completed |
2016 | Skokie CTA Station Access Improvements | Pedestrian Access to Transit | Access to Transit Program | Skokie | 62952 | 0 | 251808 | 314760 | In Progress |
2016 | Midlothian Metra Station Access Improvements | Pedestrian Access to Transit | Access to Transit Program | Midlothian | 196000 | 0 | 784000 | 980000 | Completed |
2014 | Palos Heights Pace Route Access Improvements | Pedestrian Access to Transit | Access to Transit Program | Palos Heights | 124000 | 0 | 496190 | 620190 | Completed |
2014 | Rolling Meadows Pace Route Access Improvements | Pedestrian Access to Transit | Access to Transit Program | Rolling Meadows | 243000 | 0 | 973500 | 1216500 | Completed |
2014 | La Grange Metra Station Access Improvements | Pedestrian Access to Transit | Access to Transit Program | La Grange | 77000 | 0 | 308100 | 385100 | Completed |
2014 | Glen Ellyn Pace Route Access Improvement | Pedestrian Access to Transit | Access to Transit Program | Glen Ellyn | 37000 | 0 | 150720 | 187720 | Completed |
2022 | Sauk Trail and Torrence Ave Corridor Study | Corridor Planning | Community Planning | Sauk Village | 156750 | 8250 | 0 | 165000 | Programmed |
2022 | Pace Far South Halsted Street Corridor Study | Corridor Planning | Community Planning | Pace Suburban Bus | 220000 | 55000 | 0 | 275000 | Programmed |
2020 | Chicago Auburn Gresham 79th Street Corridor Plan | Corridor Planning | Community Planning | Chicago | 114000 | 6000 | 0 | 120000 | In Progress |
2019 | Chicago 31st Street Little Village Corridor Study | Corridor Planning | Community Planning | Chicago | 64000 | 16000 | 0 | 80000 | In Progress |
2018 | Chicago - South Shore Corridor Study | Corridor Planning | Community Planning | Chicago | 28729 | 7302 | 110000 | 146031 | Completed |
2016 | Pace Central Harlem Avenue Corridor Study | Corridor Planning | Community Planning | Pace Suburban Bus | 0 | 39900 | 159600 | 199500 | Completed |
2016 | CTA Bus Corridor Slow Zone Improvement Initiatives | Corridor Planning | Community Planning | Chicago Transit Authority (CTA) | 254876 | 63719 | 0 | 318595 | Completed |
2015 | Pace North Avenue Corridor Study | Corridor Planning | Community Planning | Pace Suburban Bus | 0 | 40000 | 160000 | 200000 | Completed |
2014 | Melrose Park Broadway Avenue Corridor Plan | Corridor Planning | Community Planning | Melrose Park | 0 | 20000 | 79998 | 99998 | Completed |
2013 | Ridgeland Avenue Corridor Study | Corridor Planning | Community Planning | Cook County Department of Transportation and Highways | 160000 | 40000 | 0 | 200000 | Completed |
2009 | Pace Harlem Avenue Corridor Plan | Corridor Planning | Community Planning | Southwest Conference of Mayors | 157724 | 39431 | 0 | 197155 | Completed |
2007 | Kane County Randall Road Pace Route 529 Plan | Corridor Planning | Community Planning | Kane County | 0 | 25000 | 100000 | 125000 | Completed |
2004 | Niles Bus Oriented-Development Plan for Milwaukee Avenue | Corridor Planning | Community Planning | Niles | 10000 | 10000 | 80000 | 100000 | Completed |
2022 | Cary TOD Developer Discussion Panel | Developer Panel | Community Planning | Cary | 3500 | 0 | 0 | 3500 | Completed |
2022 | Cicero TOD Developer Discussion Panel | Developer Panel | Community Planning | Cicero | 3500 | 0 | 0 | 3500 | Completed |
2021 | Brookfield Developer Discussion Panel - Congress Park Station | Developer Panel | Community Planning | Brookfield | 3500 | 0 | 0 | 3500 | Completed |
2020 | Milwaukee Ave. Developer Panel | Developer Panel | Community Planning | Chicago 45th Ward | 3500 | 0 | 0 | 3500 | Completed |
2020 | Calumet Park TOD Developer Discussion Panel | Developer Panel | Community Planning | Calumet Park | 3500 | 0 | 0 | 3500 | Completed |
2018 | Winthrop Harbor Developer Discussion Panel | Developer Panel | Community Planning | Winthrop Harbor | 3000 | 0 | 0 | 3000 | Completed |
2018 | Brookfield Developer Discussion Panel - Brookfield Station | Developer Panel | Community Planning | Brookfield | 3000 | 0 | 0 | 3000 | Completed |
2016 | Des Plaines TOD Developer Discussion Panel | Developer Panel | Community Planning | Des Plaines | 3000 | 0 | 0 | 3000 | Completed |
2016 | Morton Grove Developer Discussion Panel | Developer Panel | Community Planning | Morton Grove | 3000 | 0 | 0 | 3000 | Completed |
2015 | River Grove Developer Discussion Panel | Developer Panel | Community Planning | River Grove | 3000 | 0 | 0 | 3000 | Completed |
2015 | Skokie Developer Discussion Panel | Developer Panel | Community Planning | Skokie | 3000 | 0 | 0 | 3000 | Completed |
2015 | West Chicago Developer Discussion Panel | Developer Panel | Community Planning | West Chicago | 3000 | 0 | 0 | 3000 | Completed |
2014 | Fox Lake Developer Discussion Panel | Developer Panel | Community Planning | Fox Lake | 3000 | 0 | 0 | 3000 | Completed |
2014 | Bellwood Developer Discussion Panel | Developer Panel | Community Planning | Bellwood | 3000 | 0 | 0 | 3000 | Completed |
2014 | Lemont Developer Discussion Panel | Developer Panel | Community Planning | Lemont | 3000 | 0 | 0 | 3000 | Completed |
2014 | Forest Park Developer Discussion Panel | Developer Panel | Community Planning | Forest Park | 3000 | 0 | 0 | 3000 | Completed |
2014 | Tinley Park Developer / Financial Advisory Panel | Developer Panel | Community Planning | Tinley Park | 3000 | 0 | 0 | 3000 | Completed |
2013 | New Lenox Developer Discussion Panel | Developer Panel | Community Planning | New Lenox | 3750 | 0 | 0 | 3750 | Completed |
2013 | Villa Park Developer Discussion Panel | Developer Panel | Community Planning | Villa Park | 3750 | 0 | 0 | 3750 | Completed |
2013 | Oak Forest Developer Discussion Panel | Developer Panel | Community Planning | Oak Forest | 3750 | 0 | 0 | 3750 | Completed |
2013 | University Park Developer Discussion Panel | Developer Panel | Community Planning | University Park | 3500 | 0 | 0 | 3500 | Completed |
2013 | Hanover Park Developer Discussion Panel | Developer Panel | Community Planning | Hanover Park | 3750 | 0 | 0 | 3750 | Completed |
2013 | Richton Park Developer Discussion Panel | Developer Panel | Community Planning | Richton Park | 3750 | 0 | 0 | 3750 | Completed |
2013 | Blue Island Developer Discussion Panel | Developer Panel | Community Planning | Blue Island | 3750 | 0 | 0 | 3750 | Completed |
2013 | Park Forest Developer Discussion Panel | Developer Panel | Community Planning | Park Forest | 3750 | 0 | 0 | 3750 | Completed |
2012 | Wood Dale Developer Discussion Panel | Developer Panel | Community Planning | Wood Dale | 3500 | 0 | 0 | 3500 | Completed |
2012 | Bensenville Developer Discussion Panel | Developer Panel | Community Planning | Bensenville | 3500 | 0 | 0 | 3500 | Completed |
2012 | Manhattan Developer Discussion Panel | Developer Panel | Community Planning | Manhattan | 3500 | 0 | 0 | 3500 | Completed |
2012 | Mokena Developer Discussion Panel | Developer Panel | Community Planning | Mokena | 3500 | 0 | 0 | 3500 | Completed |
2012 | Franklin Park Developer Discussion Panel | Developer Panel | Community Planning | Franklin Park | 3500 | 0 | 0 | 3500 | Completed |
2012 | Midlothian Developer Discussion Panel | Developer Panel | Community Planning | Midlothian | 3500 | 0 | 0 | 3500 | Completed |
2012 | Maywood Developer Discussion Panel | Developer Panel | Community Planning | Maywood | 3500 | 0 | 0 | 3500 | Completed |
2015 | Aurora Pedestrian Access to Transit Improvement Plan | Pedestrian Access to Transit | Community Planning | Aurora | 0 | 0 | 0 | 0 | Completed |
2014 | Park Forest TOD Pedestrian Access Plan | Pedestrian Access to Transit | Community Planning | Park Forest | 0 | 0 | 0 | 0 | Completed |
2012 | Robbins Pedestrian Access Improvement Plan | Pedestrian Access to Transit | Community Planning | Robbins | 11857 | 0 | 47426 | 59283 | Completed |
2012 | La Grange Stone Avenue Station Access Improvement Plan | Pedestrian Access to Transit | Community Planning | La Grange | 0 | 0 | 0 | 0 | Completed |
2021 | Kimball Station Area Curbside Management and Mobility Study | Pedestrian Access to Transit - Mobility Management | Community Planning | Chicago | 90000 | 110000 | 0 | 200000 | Programmed |
2019 | Park Forest, Matteson and Richton Park Transportation Alternatives Study | Pedestrian Access to Transit - Mobility Management | Community Planning | Park Forest | 1000 | 0 | 0 | 1000 | Completed |
2022 | La Grange TOD Plan Update | TOD Plan Update | Community Planning | La Grange | 80000 | 20000 | 0 | 100000 | Programmed |
2022 | Richton Park TOD Plan Update | TOD Plan Update | Community Planning | Richton Park | 108000 | 12000 | 0 | 120000 | Programmed |
2020 | Harvey TOD Plan Update | TOD Plan Update | Community Planning | Harvey | 25920 | 2500 | 113679 | 142099 | Completed |
2020 | University Park TOD Plan Update | TOD Plan Update | Community Planning | University Park | 25484 | 2500 | 111935 | 139919 | In Progress |
2021 | Berwyn TOD Zoning Code Update | TOD Zoning | Community Planning | Berwyn | 25000 | 0 | 0 | 25000 | In Progress |
2021 | Maywood TOD Zoning Code Update | TOD Zoning | Community Planning | Maywood | 30000 | 0 | 0 | 30000 | In Progress |
2021 | Robbins TOD Zoning Code Update | TOD Zoning | Community Planning | Robbins | 40000 | 0 | 0 | 40000 | Programmed |
2020 | Hanover Park TOD Zoning Code Update | TOD Zoning | Community Planning | Hanover Park | 20439 | 0 | 0 | 20439 | Completed |
2019 | Riverside TOD Zoning Code Update | TOD Zoning | Community Planning | Riverside | 35000 | 0 | 0 | 35000 | In Progress |
2018 | Bartlett TOD Zoning Update | TOD Zoning | Community Planning | Bartlett | 18875 | 0 | 0 | 18875 | Completed |
2018 | Cicero Zoning Code Update | TOD Zoning | Community Planning | Cicero | 87410 | 9712 | 0 | 97122 | In Progress |
2016 | Morton Grove TOD Zoning Update | TOD Zoning | Community Planning | Morton Grove | 25000 | 0 | 0 | 25000 | Completed |
2016 | Olympia Fields TOD Zoning Update | TOD Zoning | Community Planning | Olympia Fields | 25000 | 0 | 0 | 25000 | Completed |
2015 | Forest Park TOD Zoning Code Update (Roosevelt & Harlem) | TOD Zoning | Community Planning | Forest Park | 4000 | 0 | 16000 | 20000 | Completed |
2015 | Highwood TOD Zoning Update | TOD Zoning | Community Planning | Highwood | 4000 | 0 | 16000 | 20000 | Completed |
2015 | Brookfield TOD Zoning Update | TOD Zoning | Community Planning | Brookfield | 4000 | 0 | 16000 | 20000 | Completed |
2015 | Evanston TOD Parking Regulations Update | TOD Zoning | Community Planning | Evanston | 5000 | 0 | 20000 | 25000 | Completed |
2014 | Geneva TOD Zoning Update | TOD Zoning | Community Planning | Geneva | 4000 | 0 | 16000 | 20000 | Completed |
2013 | Franklin Park Zoning Code Update | TOD Zoning | Community Planning | Franklin Park | 4334 | 0 | 17332 | 21666 | Completed |
2013 | Winthrop Harbor TOD Zoning Code Update | TOD Zoning | Community Planning | Winthrop Harbor | 4334 | 0 | 17332 | 21666 | Completed |
2013 | Northbrook TOD Zoning Code Update | TOD Zoning | Community Planning | Northbrook | 4334 | 0 | 17332 | 21666 | Completed |
2012 | Buffalo Grove TOD Zoning Code Update | TOD Zoning | Community Planning | Buffalo Grove | 4334 | 0 | 17332 | 21666 | Completed |
2012 | Wilmette TOD Zoning Code Update (Parking) | TOD Zoning | Community Planning | Wilmette | 2000 | 0 | 8000 | 10000 | Completed |
2012 | Villa Park TOD Zoning Code Update | TOD Zoning | Community Planning | Villa Park | 4334 | 0 | 17332 | 21666 | Completed |
2011 | Manhattan TOD Zoning Code Update | TOD Zoning | Community Planning | Manhattan | 21666 | 0 | 0 | 21666 | Completed |
2011 | Prairie Grove TOD Zoning Code Update | TOD Zoning | Community Planning | Prairie Grove | 21666 | 0 | 0 | 21666 | Completed |
2011 | Blue Island TOD Zoning Code Update | TOD Zoning | Community Planning | Blue Island | 21666 | 0 | 0 | 21666 | Completed |
2020 | CTA Bus Priority Zones Plan - Halsted Street | Transit Improvement Plan | Community Planning | Chicago Transit Authority (CTA) | 150000 | 150000 | 0 | 300000 | In Progress |
2020 | DuPage County Mobility Plan | Transit Improvement Plan | Community Planning | DuPage County | 75901 | 18975 | 0 | 94876 | In Progress |
2019 | Pace I-294 Tri-State Market and Facilities Feasibility Study | Transit Improvement Plan | Community Planning | Pace Suburban Bus | 0 | 47619 | 190476 | 238095 | Completed |
2019 | Metra Station Evaluation | Transit Improvement Plan | Community Planning | Metra | 52000 | 13000 | 0 | 65000 | Completed |
2018 | North Central Service Analysis and Implementation Study | Transit Improvement Plan | Community Planning | Mundelein | 50000 | 25000 | 50000 | 125000 | Completed |
2016 | DuPage Last Mile Transit Planning Study | Transit Improvement Plan | Community Planning | DuPage County Division of Transportation | 0 | 0 | 0 | 0 | Completed |
2015 | Mount Prospect Rand Road Corridor Plan | Transit Improvement Plan | Community Planning | Mount Prospect | 100000 | 25000 | 0 | 125000 | Completed |
2015 | Pace Local Transit Planning For Hoffman Estates, Waukegan and Woodridge | Transit Improvement Plan | Community Planning | Pace Suburban Bus | 0 | 30000 | 120000 | 150000 | Completed |
2015 | Aurora Station Boulevard Transit Plan Update | Transit Improvement Plan | Community Planning | Aurora | 0 | 0 | 0 | 0 | Completed |
2014 | Kane County Ride-in-Kane Assessment | Transit Improvement Plan | Community Planning | Kane County DOT | 0 | 15000 | 60000 | 75000 | Completed |
2013 | Pace Fox Valley Study | Transit Improvement Plan | Community Planning | Pace Suburban Bus | 80000 | 20000 | 0 | 100000 | Completed |
2012 | Village of Carpentersville Transit Improvement Plan | Transit Improvement Plan | Community Planning | Carpentersville | 59983 | 14996 | 0 | 74979 | Completed |
2012 | Kenilworth Corridor Transportation and Streetscape Plan | Transit Improvement Plan | Community Planning | Kenilworth | 59999 | 15000 | 0 | 74999 | Completed |
2011 | Rolling Meadows Golf Road Transit and Pedestrian Mobility Study | Transit Improvement Plan | Community Planning | Rolling Meadows | 71008 | 17752 | 0 | 88760 | Completed |
2011 | Hoffman Estates Flexible Transit Service Operations | Transit Improvement Plan | Community Planning | Hoffman Estates | 64000 | 16000 | 0 | 80000 | Completed |
2011 | Naperville Metra Station Bus Depot and Commuter Access Feasibility Study | Transit Improvement Plan | Community Planning | Naperville | 63327 | 15832 | 0 | 79159 | Completed |
2011 | Cicero Avenue Corridor Plan | Transit Improvement Plan | Community Planning | Southwest Conference of Mayors | 160000 | 40000 | 0 | 200000 | Completed |
2011 | McHenry County Services Restructuring Study | Transit Improvement Plan | Community Planning | McHenry County | 119997 | 29999 | 0 | 149996 | Completed |
2010 | Pace Transit Signal Priority Planning for the Milwaukee Avenue Arterial Rapid Transit | Transit Improvement Plan | Community Planning | Pace Suburban Bus | 94642 | 23660 | 0 | 118302 | Completed |
2010 | Chicago South Lakefront Corridor Transit Study | Transit Improvement Plan | Community Planning | Chicago | 359956 | 89989 | 0 | 449945 | Completed |
2010 | South Elgin Transit Improvement Plan | Transit Improvement Plan | Community Planning | South Elgin | 60000 | 15000 | 0 | 75000 | Completed |
2010 | Hanover Park - County Farm Road Transit Service Study | Transit Improvement Plan | Community Planning | Hanover Park | 120000 | 30000 | 0 | 150000 | Completed |
2009 | Kane County LRP Transit Component | Transit Improvement Plan | Community Planning | Kane County | 80000 | 39738 | 0 | 119738 | Completed |
2009 | DuPage County Transit Plan Update | Transit Improvement Plan | Community Planning | DuPage County | 50000 | 68533 | 0 | 118533 | Completed |
2009 | Schaumburg Transit Service Assessment | Transit Improvement Plan | Community Planning | Schaumburg | 80000 | 20000 | 0 | 100000 | Completed |
2009 | Joliet Intermodal Transportation Center Feasibility Study | Transit Improvement Plan | Community Planning | Joliet | 100000 | 25000 | 0 | 125000 | Completed |
2009 | Southwest Will TMA Study | Transit Improvement Plan | Community Planning | Joliet Arsenal Development Authority | 100000 | 25000 | 0 | 125000 | Completed |
2009 | Will County Coordinated Paratransit Study | Transit Improvement Plan | Community Planning | Will County | 79996 | 19999 | 0 | 99995 | Completed |
2009 | Pace I-355 Express Bus | Transit Improvement Plan | Community Planning | Pace Suburban Bus | 212787 | 53197 | 0 | 265984 | Completed |
2009 | St. Charles Circulator Feasibility Study | Transit Improvement Plan | Community Planning | St. Charles | 79428 | 19857 | 0 | 99285 | Completed |
2007 | Greater Roseland (Chicago) Transit-Linked Community Development Project | Transit Improvement Plan | Community Planning | Developing Communities Project (DCP) | 30000 | 0 | 120000 | 150000 | Completed |
2007 | Lake County Inter/Intra County Paratransit Transportation Study | Transit Improvement Plan | Community Planning | Lake County | 0 | 19322 | 77289 | 96611 | Completed |
2007 | Addison Advantage Transit Improvements | Transit Improvement Plan | Community Planning | Addison | 0 | 20000 | 80000 | 100000 | Completed |
2007 | Lake Forest: Forest Green Transit Study | Transit Improvement Plan | Community Planning | Lake Forest | 80000 | 20000 | 0 | 100000 | Completed |
2007 | Evanston Multi-Modal Master Transportation Plan | Transit Improvement Plan | Community Planning | Evanston | 0 | 80000 | 20000 | 100000 | Completed |
2006 | South Suburban Commuter Rail Corridor Phase I & II | Transit Improvement Plan | Community Planning | South Suburban Mayors and Managers Association (SSMMA) | 76811 | 241300 | 0 | 318111 | Completed |
2006 | Pace Service Planning Tool | Transit Improvement Plan | Community Planning | Pace Suburban Bus | 250000 | 802570 | 0 | 1052570 | Completed |
2005 | Justice Transit Improvement Study | Transit Improvement Plan | Community Planning | Justice | 6741 | 6741 | 53928 | 67410 | Completed |
2005 | Melrose Park Lake Street Transit Improvement Plan | Transit Improvement Plan | Community Planning | Melrose Park | 0 | 15770 | 63080 | 78850 | Completed |
2005 | Orland Park LaGrange Road Transit Improvement Plan | Transit Improvement Plan | Community Planning | Orland Park | 0 | 19971 | 79884 | 99855 | Completed |
2005 | Naperville Circulator Implementation Plan | Transit Improvement Plan | Community Planning | Naperville | 65634 | 16409 | 0 | 82043 | Completed |
2004 | Skokie and Evanston: Skokie Swift Corridor Travel Market Analysis | Transit Improvement Plan | Community Planning | Evanston/Skokie | 120000 | 30000 | 0 | 150000 | Completed |
2004 | DuPage Phase I Community Circulators | Transit Improvement Plan | Community Planning | DuPage Mayors & Managers | 140151 | 30000 | 0 | 170151 | Completed |
2003 | Cook-DuPage Corridor Study | Transit Improvement Plan | Community Planning | Regional Transportation Authority (RTA) | 1039789 | 0 | 578211 | 1618000 | Completed |
2003 | Pace Market Feasibility Study for North Central Shuttle Service | Transit Improvement Plan | Community Planning | Pace Suburban Bus | 15083 | 0 | 60334 | 75417 | Completed |
2001 | Lake County 2020 Transportation Plan: Transit Component | Transit Improvement Plan | Community Planning | Lake County | 0 | 0 | 0 | 0 | Completed |
2000 | Joliet Arsenal Area Transportation Plan | Transit Improvement Plan | Community Planning | Joliet Arsenal Development Authority | 20000 | 90000 | 80000 | 190000 | Completed |
2000 | McHenry County Transportation Plan: Transit Component | Transit Improvement Plan | Community Planning | McHenry County | 0 | 0 | 0 | 0 | Completed |
2000 | Inner and Outer Circumferential Rail Corridors Feasibility Study | Transit Improvement Plan | Community Planning | Metra | 30755 | 51464 | 106502 | 188721 | Completed |
2000 | Skokie Swift Station Location Feasibility Study | Transit Improvement Plan | Community Planning | Skokie | 39912 | 39971 | 80000 | 159883 | Completed |
1999 | Kane County Transit Opportunity Assessment | Transit Improvement Plan | Community Planning | Kane County | 0 | 16736 | 27000 | 43736 | Completed |
1999 | Lake County Route 60 and Route 22 Corridor Shuttle Study | Transit Improvement Plan | Community Planning | TMA of Lake Cook | 45000 | 0 | 0 | 45000 | Completed |
1999 | DuPage Area Transit Plan | Transit Improvement Plan | Community Planning | DuPage Mayors & Managers | 150778 | 0 | 126467 | 277245 | Completed |
1998 | Northwest Corridor Study | Transit Improvement Plan | Community Planning | Northwest Municipal Conference | 346487 | 298974 | 484000 | 1129461 | Completed |
2022 | Homewood Downtown TOD Plan | Transit-Oriented Development Plan | Community Planning | Homewood | 114750 | 20250 | 0 | 135000 | Programmed |
2020 | Elburn TOD Plan | Transit-Oriented Development Plan | Community Planning | Elburn | 106173 | 18736 | 0 | 124909 | Completed |
2019 | Crystal Lake TOD Planning Study | Transit-Oriented Development Plan | Community Planning | Crystal Lake | 199956 | 29989 | 0 | 229945 | Completed |
2019 | Itasca Downtown Strategic Action Plan Update | Transit-Oriented Development Plan | Community Planning | Itasca | 72623 | 18156 | 0 | 90779 | Completed |
2019 | Cary Downtown Strategic Plan | Transit-Oriented Development Plan | Community Planning | Cary | 0 | 21449 | 85797 | 107246 | Completed |
2019 | Elevated Chicago Action Plans | Transit-Oriented Development Plan | Community Planning | Elevated Chicago | 80000 | 20000 | 0 | 100000 | In Progress |
2018 | Robbins TOD Plan Update | Transit-Oriented Development Plan | Community Planning | Robbins | 25000 | 0 | 0 | 25000 | In Progress |
2018 | Maywood TOD Plan Update | Transit-Oriented Development Plan | Community Planning | Maywood | 11762 | 3250 | 50000 | 65012 | Completed |
2016 | Chicago - Jefferson Park Station Area Master Plan | Transit-Oriented Development Plan | Community Planning | Chicago | 20000 | 25000 | 80000 | 125000 | Completed |
2015 | Bartlett Downtown / TOD Plan | Transit-Oriented Development Plan | Community Planning | Bartlett | 0 | 24985 | 99940 | 124925 | Completed |
2015 | Libertyville TOD Plan | Transit-Oriented Development Plan | Community Planning | Libertyville | 80000 | 20000 | 0 | 100000 | Completed |
2015 | Palatine TOD Plan | Transit-Oriented Development Plan | Community Planning | Palatine | 79994 | 19999 | 0 | 99993 | Completed |
2015 | Worth TOD Plan | Transit-Oriented Development Plan | Community Planning | Worth | 19955 | 14966 | 39909 | 74830 | Completed |
2013 | City of Chicago Ashland-Western Bus Rapid Transit Land Use Development Plan | Transit-Oriented Development Plan | Community Planning | Chicago | 160000 | 40000 | 0 | 200000 | Completed |
2013 | Highwood Transit-Oriented Development Plan | Transit-Oriented Development Plan | Community Planning | Highwood | 100000 | 25000 | 0 | 125000 | Completed |
2013 | City of Chicago Metra Station Area Typology Study | Transit-Oriented Development Plan | Community Planning | Chicago | 100000 | 25000 | 0 | 125000 | Completed |
2013 | River Grove Thatcher Avenue TOD | Transit-Oriented Development Plan | Community Planning | River Grove | 60000 | 15000 | 0 | 75000 | Completed |
2012 | Westmont TOD Zoning Code Update | Transit-Oriented Development Plan | Community Planning | Westmont | 4334 | 0 | 17332 | 21666 | Completed |
2012 | Cicero Connections Initiative | Transit-Oriented Development Plan | Community Planning | Cicero | 118503 | 29626 | 0 | 148129 | Completed |
2012 | Fox Lake Station Area Plan | Transit-Oriented Development Plan | Community Planning | Fox Lake | 80000 | 20000 | 0 | 100000 | Completed |
2012 | Evanston Main Street Station Transit-Oriented Development Plan | Transit-Oriented Development Plan | Community Planning | Evanston | 100000 | 25000 | 0 | 125000 | Completed |
2012 | Lake Villa Downtown TOD Plan | Transit-Oriented Development Plan | Community Planning | Lake Villa | 99872 | 24968 | 0 | 124840 | Completed |
2012 | Mount Prospect Downtown Implementation Plan | Transit-Oriented Development Plan | Community Planning | Mount Prospect | 78876 | 19719 | 0 | 98595 | Completed |
2011 | Elgin Chicago Street Station Area Plan | Transit-Oriented Development Plan | Community Planning | Elgin | 80000 | 20000 | 0 | 100000 | Completed |
2011 | Romeoville East Side Plan | Transit-Oriented Development Plan | Community Planning | Romeoville | 79960 | 19990 | 0 | 99950 | Completed |
2011 | Northbrook Downtown Station Area Plan | Transit-Oriented Development Plan | Community Planning | Northbrook | 99604 | 24901 | 0 | 124505 | Completed |
2011 | Chicago Southland TOD Corridor Planning Study Phase II Implementation | Transit-Oriented Development Plan | Community Planning | South Suburban Mayors and Managers Association (SSMMA) | 100000 | 25000 | 0 | 125000 | Completed |
2011 | Hanover Park Village Center Transit-Oriented Development (TOD) | Transit-Oriented Development Plan | Community Planning | Hanover Park | 80000 | 20000 | 0 | 100000 | Completed |
2010 | Skokie-Dempster Station Area Plan | Transit-Oriented Development Plan | Community Planning | Skokie | 99768 | 24942 | 0 | 124710 | Completed |
2010 | Clarendon Hills Train Station Redevelopment Phase I Implementation | Transit-Oriented Development Plan | Community Planning | Clarendon Hills | 79984 | 19996 | 0 | 99980 | Completed |
2010 | Chicago Washington Park 63rd Street Corridor TOD Study | Transit-Oriented Development Plan | Community Planning | Chicago | 119983 | 29996 | 0 | 149979 | Completed |
2010 | Lombard Downtown Implementation Study | Transit-Oriented Development Plan | Community Planning | Lombard | 100000 | 25000 | 0 | 125000 | Completed |
2010 | Geneva Downtown / Station Area Master Plan | Transit-Oriented Development Plan | Community Planning | Geneva | 99265 | 24816 | 0 | 124081 | Completed |
2009 | Des Plaines Cumberland Transit-Oriented Development Plan | Transit-Oriented Development Plan | Community Planning | Des Plaines | 83550 | 0 | 41152 | 124702 | Completed |
2009 | Prairie Grove Town Center and TOD Development Plan | Transit-Oriented Development Plan | Community Planning | Prairie Grove | 94734 | 23684 | 0 | 118418 | Completed |
2009 | East Dundee: Dundee Crossing Transit Center | Transit-Oriented Development Plan | Community Planning | East Dundee | 79816 | 19954 | 0 | 99770 | Completed |
2009 | Antioch Downtown Land Use and Transit Implementation Strategy | Transit-Oriented Development Plan | Community Planning | Antioch | 79766 | 19942 | 0 | 99708 | Completed |
2009 | Chicago - Metra Milwaukee District West Line Transit-Friendly Development Plan | Transit-Oriented Development Plan | Community Planning | Chicago | 175698 | 43924 | 0 | 219622 | Completed |
2009 | Glenwood Station Area Study | Transit-Oriented Development Plan | Community Planning | Glenwood | 73400 | 18350 | 0 | 91750 | Completed |
2009 | Western Springs Downtown Plan | Transit-Oriented Development Plan | Community Planning | Western Springs | 95984 | 23996 | 0 | 119980 | Completed |
2009 | Manhattan Village Center | Transit-Oriented Development Plan | Community Planning | Manhattan | 100000 | 25018 | 0 | 125018 | Completed |
2009 | Bensenville Transit Improvement Plan and Station Area Study | Transit-Oriented Development Plan | Community Planning | Bensenville | 98504 | 24626 | 0 | 123130 | Completed |
2009 | Chicago Southland Transit Region | Transit-Oriented Development Plan | Community Planning | South Suburban Mayors and Managers Association (SSMMA) | 140000 | 35000 | 0 | 175000 | Completed |
2009 | Wilmette Village Center Master Plan | Transit-Oriented Development Plan | Community Planning | Wilmette | 99302 | 24826 | 0 | 124128 | Completed |
2007 | Marengo Station Area Plan | Transit-Oriented Development Plan | Community Planning | Marengo | 0 | 19948 | 79792 | 99740 | Completed |
2007 | Plainfield STAR Line Transit-Oriented Development District Plan | Transit-Oriented Development Plan | Community Planning | Plainfield | 0 | 24625 | 98498 | 123123 | Completed |
2007 | South Chicago Heights Station Area Plan | Transit-Oriented Development Plan | Community Planning | South Chicago Heights | 0 | 19931 | 79724 | 99655 | Completed |
2007 | Chicago Transit-Friendly Development at CTA Stations | Transit-Oriented Development Plan | Community Planning | Chicago | 200000 | 50000 | 0 | 250000 | Completed |
2007 | Huntley Transit-Oriented Development Guidelines | Transit-Oriented Development Plan | Community Planning | Huntley | 0 | 21103 | 84410 | 105513 | Completed |
2007 | Chicago Heights Station Area Plan | Transit-Oriented Development Plan | Community Planning | Chicago Heights | 0 | 19915 | 79660 | 99575 | Completed |
2006 | Montgomery Park and Ride Facility Plan | Transit-Oriented Development Plan | Community Planning | Montgomery | 80000 | 32496 | 0 | 112496 | Completed |
2006 | Crete Downtown and Balmoral Park Station Area Plans | Transit-Oriented Development Plan | Community Planning | Crete | 2770 | 20000 | 91080 | 113850 | Completed |
2006 | Winfield Town Center Revitalization Plan | Transit-Oriented Development Plan | Community Planning | Winfield | 938 | 20000 | 83750 | 104688 | Completed |
2006 | Elgin National Street Station Area Plan | Transit-Oriented Development Plan | Community Planning | Elgin | 0 | 20000 | 80000 | 100000 | Completed |
2006 | Berwyn Transit-Oriented Master Plan | Transit-Oriented Development Plan | Community Planning | Berwyn | 19078 | 0 | 76313 | 95391 | Completed |
2005 | Buffalo Grove Transit-Oriented Development Plan | Transit-Oriented Development Plan | Community Planning | Buffalo Grove | 12443 | 12443 | 99541 | 124427 | Completed |
2005 | Bellwood Transit Oriented-Development Plan | Transit-Oriented Development Plan | Community Planning | Bellwood | 0 | 20771 | 83084 | 103855 | Completed |
2005 | Villa Park Station Area Plan | Transit-Oriented Development Plan | Community Planning | Villa Park | 0 | 15577 | 62310 | 77887 | Completed |
2005 | Elmwood Park Station Area Plan | Transit-Oriented Development Plan | Community Planning | Elmwood Park | 0 | 19023 | 76094 | 95117 | Completed |
2005 | Mokena Transit-Oriented Development Plan | Transit-Oriented Development Plan | Community Planning | Mokena | 4900 | 20000 | 99600 | 124500 | Completed |
2004 | Park Forest Metra Electric District 211th Street Station Area Plan | Transit-Oriented Development Plan | Community Planning | Park Forest | 10200 | 9800 | 80000 | 100000 | Completed |
2004 | Wood Dale Station Area Plan | Transit-Oriented Development Plan | Community Planning | Wood Dale | 0 | 18340 | 73360 | 91700 | Completed |
2004 | Midlothian Station Area Enhancement | Transit-Oriented Development Plan | Community Planning | Midlothian | 60000 | 0 | 80000 | 140000 | Completed |
2004 | Harvey Intermodal Station Area Plan | Transit-Oriented Development Plan | Community Planning | Harvey | 16739 | 0 | 66954 | 83693 | Completed |
2003 | New Lenox Station Area Plan | Transit-Oriented Development Plan | Community Planning | New Lenox | 0 | 24326 | 97303 | 121629 | Completed |
2003 | Mundelein Station Area Plan | Transit-Oriented Development Plan | Community Planning | Mundelein | 0 | 18568 | 60000 | 78568 | Completed |
2003 | Riverside Central Business District Station Area Plan | Transit-Oriented Development Plan | Community Planning | Riverside | 0 | 15000 | 60000 | 75000 | Completed |
2003 | Oak Park Intermodal Station Area Plan | Transit-Oriented Development Plan | Community Planning | Oak Park | 0 | 181518 | 60000 | 241518 | Completed |
2003 | Winthrop Harbor Station Area Plan | Transit-Oriented Development Plan | Community Planning | Winthrop Harbor | 0 | 14440 | 57760 | 72200 | Completed |
2003 | La Grange Comprehensive Plan Update and BNSF Corridor Plan | Transit-Oriented Development Plan | Community Planning | La Grange | 0 | 65000 | 60000 | 125000 | Completed |
2002 | North Chicago Station Area Planning Study | Transit-Oriented Development Plan | Community Planning | North Chicago | 0 | 14964 | 59856 | 74820 | Completed |
2002 | Wheeling Station Area Planning Study | Transit-Oriented Development Plan | Community Planning | Wheeling | 0 | 15000 | 60000 | 75000 | Completed |
2002 | Lemont Station Area Planning Study | Transit-Oriented Development Plan | Community Planning | Lemont | 0 | 20000 | 80000 | 100000 | Completed |
2002 | Franklin Park West Line Station Area Planning Study | Transit-Oriented Development Plan | Community Planning | Franklin Park | 0 | 15000 | 60000 | 75000 | Completed |
2002 | Richton Park Station Area Planning Study | Transit-Oriented Development Plan | Community Planning | Richton Park | 10042 | 7500 | 70168 | 87710 | Completed |
2001 | Fox River Grove Downtown Redevelopment Plan | Transit-Oriented Development Plan | Community Planning | Fox River Grove | 0 | 14500 | 58000 | 72500 | Completed |
2001 | Maywood Station Area Planning Study | Transit-Oriented Development Plan | Community Planning | Maywood | 17620 | 0 | 70748 | 88368 | Completed |
2001 | Woodstock Transit-Oriented Development Study | Transit-Oriented Development Plan | Community Planning | Woodstock | 0 | 13500 | 54000 | 67500 | Completed |
2000 | Riverdale 138th Street Station Planning Study | Transit-Oriented Development Plan | Community Planning | Riverdale | 9700 | 0 | 38800 | 48500 | Completed |
2000 | Robbins Metra Station Transit-Oriented Development Study | Transit-Oriented Development Plan | Community Planning | Robbins | 11400 | 0 | 45600 | 57000 | Completed |
2000 | Hazel Crest 170th Street Station Transit-Oriented Development Planning Study | Transit-Oriented Development Plan | Community Planning | Hazel Crest | 11000 | 0 | 44000 | 55000 | Completed |
2000 | Morton Grove Commuter Station Location Analysis | Transit-Oriented Development Plan | Community Planning | Morton Grove | 50000 | 49500 | 0 | 99500 | Completed |
2000 | University Park Transit-Oriented Development Planning Study | Transit-Oriented Development Plan | Community Planning | University Park | 0 | 14987 | 59946 | 74933 | Completed |
1999 | Waukegan Intermodal Transit Facility Study | Transit-Oriented Development Plan | Community Planning | Waukegan | 15000 | 40000 | 60000 | 115000 | Completed |
1999 | Elmhurst Downtown Plan | Transit-Oriented Development Plan | Community Planning | Elmhurst | 7500 | 0 | 0 | 7500 | Completed |
1999 | Evanston Transportation Center Planning Study | Transit-Oriented Development Plan | Community Planning | Evanston | 69447 | 29763 | 0 | 99210 | Completed |
1999 | Westmont Transit-Oriented Development Opportunity Study | Transit-Oriented Development Plan | Community Planning | Westmont | 20000 | 0 | 20000 | 40000 | Completed |
1999 | Orland Park Transit-Oriented Development Planning Study | Transit-Oriented Development Plan | Community Planning | Orland Park | 30000 | 20000 | 0 | 50000 | Completed |
1999 | Blue Island Transit-Oriented Development | Transit-Oriented Development Plan | Community Planning | Blue Island | 22200 | 0 | 0 | 22200 | Completed |
1999 | Olympia Fields Town Center Development Plan | Transit-Oriented Development Plan | Community Planning | Olympia Fields | 37949 | 0 | 0 | 37949 | Completed |
1998 | Tinley Park Station Area Plans | Transit-Oriented Development Plan | Community Planning | Tinley Park | 40000 | 0 | 0 | 40000 | Completed |
2007 | Mount Prospect Public Transportation System Plan | Transit-Oriented Development Plan - Transit Improvement Plan | Community Planning | Mount Prospect | 0 | 24959 | 99836 | 124795 | Completed |
2006 | Chicago--Reconnecting Neighborhoods | Transit-Oriented Development Plan - Transit Improvement Plan | Community Planning | Chicago | 51243 | 53446 | 118757 | 223446 | Completed |
2018 | Main Line Conversion to LED | Capital | Innovation, Coordination, and Enhancement (ICE) | Metra | 952594 | 0 | 0 | 952594 | In Progress |
2018 | Downtown Terminal Information Display | Capital | Innovation, Coordination, and Enhancement (ICE) | Metra | 952500 | 0 | 0 | 952500 | Programmed |
2018 | GPS Train Tracker | Capital | Innovation, Coordination, and Enhancement (ICE) | Metra | 3000000 | 0 | 0 | 3000000 | Programmed |
2018 | Intelligent Bus System (IBS) Equipment - 2018 | Capital | Innovation, Coordination, and Enhancement (ICE) | Pace Suburban Bus | 1635000 | 0 | 0 | 1635000 | In Progress |
2017 | Car and Locomotive Cameras | Capital | Innovation, Coordination, and Enhancement (ICE) | Metra | 1500000 | 0 | 0 | 1500000 | Programmed |
2017 | Revenue Accounting System | Capital | Innovation, Coordination, and Enhancement (ICE) | Metra | 1930000 | 0 | 0 | 1930000 | In Progress |
2017 | Vehicle Inspection System | Capital | Innovation, Coordination, and Enhancement (ICE) | Metra | 1000000 | 0 | 0 | 1000000 | Programmed |
2017 | Intelligent Bus System (IBS) Equipment - 2017 | Capital | Innovation, Coordination, and Enhancement (ICE) | Pace Suburban Bus | 1660000 | 0 | 0 | 1660000 | In Progress |
2017 | Luminous Platform Signs at Demonstration Locations | Capital | Innovation, Coordination, and Enhancement (ICE) | Metra | 550000 | 0 | 0 | 550000 | Programmed |
2016 | Crew Optimization System | Capital | Innovation, Coordination, and Enhancement (ICE) | Metra | 500000 | 0 | 0 | 500000 | Programmed |
2016 | Control Center - Business Continuity and Disaster Recovery Implementation | Capital | Innovation, Coordination, and Enhancement (ICE) | Chicago Transit Authority (CTA) | 500000 | 0 | 0 | 500000 | In Progress |
2016 | Software and Hardware Enhancements to Improve Efficiency | Capital | Innovation, Coordination, and Enhancement (ICE) | Chicago Transit Authority (CTA) | 1409000 | 0 | 0 | 1409000 | In Progress |
2016 | Mobile Application Support Activities | Capital | Innovation, Coordination, and Enhancement (ICE) | Metra | 2500000 | 0 | 0 | 2500000 | Programmed |
2016 | Platform Heating Technology | Capital | Innovation, Coordination, and Enhancement (ICE) | Metra | 742000 | 0 | 0 | 742000 | In Progress |
2016 | Origin - Destination Model Update and Survey | Capital | Innovation, Coordination, and Enhancement (ICE) | Chicago Transit Authority (CTA) | 500000 | 0 | 0 | 500000 | In Progress |
2016 | Automatic Passenger Counter | Capital | Innovation, Coordination, and Enhancement (ICE) | Metra | 1000000 | 0 | 0 | 1000000 | Programmed |
2016 | Intelligent Bus System (IBS) Equipment - 2016 | Capital | Innovation, Coordination, and Enhancement (ICE) | Pace Suburban Bus | 1635452 | 0 | 0 | 1635452 | In Progress |
2016 | Information Technology Project Implementation | Capital | Innovation, Coordination, and Enhancement (ICE) | Chicago Transit Authority (CTA) | 1200000 | 0 | 0 | 1200000 | In Progress |
2016 | Facilities and Vehicle Maintenance Improvements and Efficiencies | Capital | Innovation, Coordination, and Enhancement (ICE) | Chicago Transit Authority (CTA) | 1137000 | 0 | 0 | 1137000 | In Progress |
2015 | Passenger Information: Signs and Announcements | Capital | Innovation, Coordination, and Enhancement (ICE) | Metra | 2725800 | 0 | 0 | 2725800 | In Progress |
2015 | Ventra Base Component Fee | Capital | Innovation, Coordination, and Enhancement (ICE) | Pace Suburban Bus | 1200000 | 0 | 0 | 1200000 | Completed |
2015 | Electronic Crew Calling | Capital | Innovation, Coordination, and Enhancement (ICE) | Metra | 1913356 | 0 | 0 | 1913356 | In Progress |
2015 | Ventra Vending Machines | Capital | Innovation, Coordination, and Enhancement (ICE) | Pace Suburban Bus | 810000 | 0 | 0 | 810000 | Completed |
2015 | Software and Hardware Enhancements | Capital | Innovation, Coordination, and Enhancement (ICE) | Chicago Transit Authority (CTA) | 6609893 | 0 | 0 | 6609893 | In Progress |
2015 | Automated Field IT System | Capital | Innovation, Coordination, and Enhancement (ICE) | Metra | 3500000 | 0 | 0 | 3500000 | In Progress |
2015 | Video Enhancement for Bus and Rail | Capital | Innovation, Coordination, and Enhancement (ICE) | Chicago Transit Authority (CTA) | 8007280 | 0 | 0 | 8007280 | In Progress |
2015 | Mobile Application Development | Capital | Innovation, Coordination, and Enhancement (ICE) | Pace Suburban Bus | 300000 | 0 | 0 | 300000 | In Progress |
2015 | Communications Equipment and Outreach | Capital | Innovation, Coordination, and Enhancement (ICE) | Chicago Transit Authority (CTA) | 317120 | 0 | 0 | 317120 | Completed |
2015 | Ventra Implementation Improvements | Capital | Innovation, Coordination, and Enhancement (ICE) | Chicago Transit Authority (CTA) | 2378400 | 0 | 0 | 2378400 | In Progress |
2015 | Mobile Application | Capital | Innovation, Coordination, and Enhancement (ICE) | Metra | 4371936 | 0 | 0 | 4371936 | In Progress |
2015 | Hybrid Fuel Vehicles | Capital | Innovation, Coordination, and Enhancement (ICE) | Metra | 1003419 | 0 | 0 | 1003419 | Completed |
2013 | 120V AC Outlets for Passenger Use | Capital | Innovation, Coordination, and Enhancement (ICE) | Metra | 720000 | 180000 | 0 | 900000 | In Progress |
2013 | Regional Fare Solution Technologies | Capital | Innovation, Coordination, and Enhancement (ICE) | Metra | 1440000 | 360000 | 0 | 1800000 | In Progress |
2013 | Shuttle Bug Operations | Capital | Innovation, Coordination, and Enhancement (ICE) | Regional Transportation Authority (RTA) | 1200000 | 0 | 0 | 1200000 | In Progress |
2013 | Market Development Activities | Capital | Innovation, Coordination, and Enhancement (ICE) | Regional Transportation Authority (RTA) | 1000000 | 0 | 0 | 1000000 | In Progress |
2012 | Bus Pad Installation | Capital | Innovation, Coordination, and Enhancement (ICE) | Pace Suburban Bus | 78508 | 19927 | 0 | 98435 | Completed |
2012 | Regional Transit Fare System Program Management and Systems Integration | Capital | Innovation, Coordination, and Enhancement (ICE) | Metra | 1600000 | 400000 | 0 | 2000000 | In Progress |
2012 | Advanced Paging System | Capital | Innovation, Coordination, and Enhancement (ICE) | Chicago Transit Authority (CTA) | 2493307 | 623327 | 0 | 3116634 | Completed |
2012 | Rail Traffic Control (RTC) Program | Capital | Innovation, Coordination, and Enhancement (ICE) | Metra | 40472 | 10118 | 0 | 50590 | Completed |
2012 | Automatic External Defibrillators (AEDs) | Capital | Innovation, Coordination, and Enhancement (ICE) | Metra | 639800 | 159950 | 0 | 799750 | Completed |
2012 | Maintenance Management Information System: Enterprise Asset Management | Capital | Innovation, Coordination, and Enhancement (ICE) | Chicago Transit Authority (CTA) | 992875 | 248219 | 0 | 1241094 | In Progress |
2012 | Visual Information System (VIS) Installation | Capital | Innovation, Coordination, and Enhancement (ICE) | Metra | 691913 | 172978 | 0 | 864891 | In Progress |
2012 | Real Time Link to Schedules and Next Bus | Capital | Innovation, Coordination, and Enhancement (ICE) | Pace Suburban Bus | 60559 | 15140 | 0 | 75699 | Completed |
2012 | Real Time Signage | Capital | Innovation, Coordination, and Enhancement (ICE) | Pace Suburban Bus | 1280000 | 320000 | 963000 | 2563000 | In Progress |
2012 | Customer Information Displays | Capital | Innovation, Coordination, and Enhancement (ICE) | Chicago Transit Authority (CTA) | 2000000 | 500000 | 0 | 2500000 | Completed |
2012 | Blue Island/Vermont Street Interagency Transfer Improvements | Capital | Innovation, Coordination, and Enhancement (ICE) | Metra | 2000000 | 500000 | 0 | 2500000 | In Progress |
2012 | Paratransit Command Center | Capital | Innovation, Coordination, and Enhancement (ICE) | Pace Suburban Bus | 272647 | 68162 | 0 | 340809 | Completed |
2012 | Maintenance Management Information System: Modules and Upgrade Project | Capital | Innovation, Coordination, and Enhancement (ICE) | Chicago Transit Authority (CTA) | 2150577 | 537644 | 0 | 2688221 | In Progress |
2012 | Train Station Customer Upgrades | Capital | Innovation, Coordination, and Enhancement (ICE) | Chicago Transit Authority (CTA) | 1023700 | 255925 | 0 | 1279625 | Completed |
2012 | Real Time Interface for Train Tracker | Capital | Innovation, Coordination, and Enhancement (ICE) | Metra | 64000 | 16000 | 0 | 80000 | Completed |
2011 | Milwaukee Avenue Transit Signal Priority Demonstration Project | Capital | Innovation, Coordination, and Enhancement (ICE) | Pace Suburban Bus | 254343 | 63586 | 0 | 317929 | In Progress |
2009 | Automatic Bay Reading System (ABRS) for Bus Garages | Capital | Innovation, Coordination, and Enhancement (ICE) | Chicago Transit Authority (CTA) | 1280000 | 320000 | 0 | 1600000 | Completed |
2009 | Real-Time Arrival Information for Bus Stop Signs | Capital | Innovation, Coordination, and Enhancement (ICE) | Chicago Transit Authority (CTA) | 5296973 | 1324243 | 0 | 6621216 | In Progress |
2009 | Bike-Transit Integration at Chicago CTA and Metra Stations | Capital | Innovation, Coordination, and Enhancement (ICE) | Chicago DOT | 188702 | 47176 | 0 | 235878 | Completed |
2009 | Skokie Swift Oakton Street Station Area Improvement | Capital | Innovation, Coordination, and Enhancement (ICE) | Skokie | 1297389 | 324347 | 0 | 1621736 | Completed |
2009 | Dispatching with Mobile Computers and In-Vehicle Technology | Capital | Innovation, Coordination, and Enhancement (ICE) | Rich Township | 139694 | 44000 | 0 | 183694 | Completed |
2018 | South Side Service Improvements - 2018 | Operating | Innovation, Coordination, and Enhancement (ICE) | Chicago Transit Authority (CTA) | 6037270 | 0 | 0 | 6037270 | Programmed |
2017 | South Side Service Improvements - 2017 | Operating | Innovation, Coordination, and Enhancement (ICE) | Chicago Transit Authority (CTA) | 6329515 | 0 | 0 | 6329515 | Completed |
2016 | Reinstating the Ashland and Western Express Routes | Operating | Innovation, Coordination, and Enhancement (ICE) | Chicago Transit Authority (CTA) | 1091000 | 0 | 0 | 1091000 | In Progress |
2015 | Metra Special Events Service | Operating | Innovation, Coordination, and Enhancement (ICE) | Metra | 356581 | 0 | 0 | 356581 | In Progress |
2015 | Rock Island Line Enhancement | Operating | Innovation, Coordination, and Enhancement (ICE) | Metra | 819000 | 0 | 0 | 819000 | Completed |
2015 | Pace Service Enhancements 2015 | Operating | Innovation, Coordination, and Enhancement (ICE) | Pace Suburban Bus | 2133000 | 0 | 0 | 2133000 | Completed |
2009 | PACE ADA / Paratranist Operations | Operating | Innovation, Coordination, and Enhancement (ICE) | Pace Suburban Bus | 11874621 | 0 | 0 | 11874621 | Completed |
2009 | CTA Service Improvements - 2009 | Operating | Innovation, Coordination, and Enhancement (ICE) | Chicago Transit Authority (CTA) | 160000 | 40000 | 0 | 200000 | Completed |
2009 | Southwest Service Saturday Service | Operating | Innovation, Coordination, and Enhancement (ICE) | Metra | 332206 | 332206 | 0 | 664412 | Completed |
2009 | I-355 Corridor Development Project | Operating | Innovation, Coordination, and Enhancement (ICE) | Pace Suburban Bus | 53995 | 53995 | 0 | 107990 | Completed |
2009 | I-55 Corridor Enhancement Project | Operating | Innovation, Coordination, and Enhancement (ICE) | Pace Suburban Bus | 226600 | 226600 | 0 | 453200 | Completed |
2009 | Lake County Northwest Circulator | Operating | Innovation, Coordination, and Enhancement (ICE) | Lake County | 260930 | 261000 | 0 | 521930 | Completed |
2009 | CTA Operations | Operating | Innovation, Coordination, and Enhancement (ICE) | Chicago Transit Authority (CTA) | 5000000 | 0 | 0 | 5000000 | Completed |
2021 | Volunteer Express '13-14 | Administration - Operating | Section 5310 / JARC / NF | Hanover Township | 0 | 0 | 4800 | 4800 | Completed |
2019 | Ride in Kane Phase 17 & 18 | Administration - Operating | Section 5310 / JARC / NF | Association for Individual Development (AID) | 0 | 2497996 | 2502996 | 5000992 | Programmed |
2012 | Volunteer Express '12 | Administration - Operating | Section 5310 / JARC / NF | Hanover Township | 0 | 0 | 12969 | 12969 | Completed |
2012 | Ways to Work '12 | Administration - Operating | Section 5310 / JARC / NF | Salvation Army Family & Community Services | 0 | 317541 | 384432 | 701973 | Completed |
2012 | Ride in Kane Phase 9 & 10 | Administration - Operating - Mobility Management | Section 5310 / JARC / NF | Association for Individual Development (AID) | 0 | 2761713 | 2851898 | 5613611 | In Progress |
2021 | McHenry County Service Integration & Coordination_'20-'21 | Capital | Section 5310 / JARC / NF | McHenry County | 0 | 20000 | 80000 | 100000 | Programmed |
2021 | CTF Illinois Transportation Services for People with Disabilities_'20-'21 | Capital | Section 5310 / JARC / NF | CTF Illinois | 0 | 1319 | 5276 | 6595 | Programmed |
2016 | Tactile Signage at CTA Bus Stops | Capital | Section 5310 / JARC / NF | Chicago Transit Authority (CTA) | 0 | 95087 | 380350 | 475437 | In Progress |
2015 | Little City Transportation Program '15 | Capital | Section 5310 / JARC / NF | Little City Foundation | 0 | 223780 | 223780 | 447560 | Completed |
2013 | Metra Visual Information Systems (VIS) at Non-key ADA Metra Stations | Capital | Section 5310 / JARC / NF | Metra | 0 | 75000 | 300000 | 375000 | Completed |
2013 | City of Chicago Taxi Wheelchair Accessible Vehicle Cost Reimbursement Program | Capital | Section 5310 / JARC / NF | Chicago Dept. of Business Affairs & Consumer Protection | 0 | 442923 | 1771689 | 2214612 | In Progress |
2010 | Concrete Waiting Areas at Bus Stops | Capital | Section 5310 / JARC / NF | Pace Suburban Bus | 0 | 0 | 600000 | 600000 | Completed |
2021 | Kendall Community Transit Program '13-14 | Capital - Operating | Section 5310 / JARC / NF | Kendall County | 0 | 184000 | 184000 | 368000 | Completed |
2010 | Ways to Work '10 | Capital - Operating | Section 5310 / JARC / NF | Salvation Army Family & Community Services | 0 | 243854 | 289934 | 533788 | Completed |
2008 | Kendall Community Transit Program '08 | Capital - Operating | Section 5310 / JARC / NF | Kendall County | 0 | 387915 | 512159 | 900074 | Completed |
2011 | Will County Mobility Management Program '11 | Capital - Operating - Mobility Management | Section 5310 / JARC / NF | Will County | 0 | 386000 | 506000 | 892000 | Completed |
2010 | McHenry County Service Integration & Coordination '10 | Capital - Operating - Mobility Management | Section 5310 / JARC / NF | McHenry County | 0 | 790979 | 805442 | 1596421 | Completed |
2021 | Ride in Kane Phase 19 & 20 | Mobility Management | Section 5310 / JARC / NF | Kane County | 0 | 40000 | 160000 | 200000 | Programmed |
2021 | Kendall Area Transit_'20-'21 | Mobility Management | Section 5310 / JARC / NF | Kendall County | 0 | 7500 | 30000 | 37500 | Programmed |
2021 | Will County Will Ride Transportation Services_'20'21 | Mobility Management | Section 5310 / JARC / NF | Will County | 0 | 48000 | 192000 | 240000 | Programmed |
2021 | RGA - Transp. Collaborative for Individuals with Development Disabilities | Mobility Management | Section 5310 / JARC / NF | Ray Graham Association | 0 | 59680 | 238720 | 298400 | Programmed |
2021 | Phase VIII Regional Call Center '20-'21 | Mobility Management | Section 5310 / JARC / NF | Pace Suburban Bus | 0 | 621099 | 2484395 | 3105494 | Programmed |
2019 | Phase VII Regional Call Center '18-'19 | Mobility Management | Section 5310 / JARC / NF | Pace Suburban Bus | 0 | 566491 | 2265964 | 2832455 | Completed |
2017 | Phase VI Regional Call Center '16-'17 | Mobility Management | Section 5310 / JARC / NF | Pace Suburban Bus | 0 | 443377 | 1773508 | 2216885 | Completed |
2014 | Will County Mobility Management Program '13-14 | Mobility Management | Section 5310 / JARC / NF | Will County | 0 | 16346 | 65385 | 81731 | Completed |
2013 | CTA Rail Station Guides for CTA Customers Who are Blind or Visually Impaired | Mobility Management | Section 5310 / JARC / NF | Chicago Transit Authority (CTA) | 0 | 9825 | 43230 | 53055 | In Progress |
2011 | RGAs Safety Transportation Training Program '11 | Mobility Management | Section 5310 / JARC / NF | Ray Graham Association | 0 | 15331 | 61326 | 76657 | Completed |
2008 | RGAs Safety Transportation Training Program '08 | Mobility Management | Section 5310 / JARC / NF | Ray Graham Association | 0 | 8681 | 34725 | 43406 | Completed |
2008 | Pace Regional Call Center | Mobility Management | Section 5310 / JARC / NF | Pace Suburban Bus | 0 | 3409112 | 13676831 | 17085943 | Completed |
2021 | Naperville _ Ride DuPage to Work '20-'21 | Operating | Section 5310 / JARC / NF | Naperville | 0 | 600000 | 600000 | 1200000 | Programmed |
2021 | Clearbrook - Community Connections for Adults with Disabilities_'20-'21 | Operating | Section 5310 / JARC / NF | Clearbrook | 0 | 200000 | 200000 | 400000 | In Progress |
2021 | CTF Illinois Transportation Services for People with Disabilities_'20-'21 | Operating | Section 5310 / JARC / NF | CTF Illinois | 0 | 100000 | 100000 | 200000 | In Progress |
2021 | DuPage County Transportation to Work_'20-'21 | Operating | Section 5310 / JARC / NF | DuPage County | 0 | 591000 | 591000 | 1182000 | In Progress |
2021 | Kendall Area Transit_'20-'21 | Operating | Section 5310 / JARC / NF | Kendall County | 0 | 320000 | 320000 | 640000 | In Progress |
2021 | Little City Transportation to Work '20-'21 | Operating | Section 5310 / JARC / NF | Little City Foundation | 0 | 500000 | 500000 | 1000000 | In Progress |
2021 | RGA Comprehensive Transportation Program '20-'21 | Operating | Section 5310 / JARC / NF | Ray Graham Association | 0 | 752000 | 752000 | 1504000 | Programmed |
2021 | Will County Will Ride Transportation Services_'20'21 | Operating | Section 5310 / JARC / NF | Will County | 0 | 400000 | 400000 | 800000 | Programmed |
2021 | Ride in Kane Phase 19 & 20 | Operating | Section 5310 / JARC / NF | Kane County | 0 | 0 | 2500000 | 2500000 | Programmed |
2021 | McHenry County Service Integration & Coordination_'20-'21 | Operating | Section 5310 / JARC / NF | McHenry County | 0 | 1400000 | 1400000 | 2800000 | In Progress |
2019 | CTF Illinois - Transportation Services for People with Disabilities '18-'19 | Operating | Section 5310 / JARC / NF | CTF Illinois | 0 | 100000 | 100000 | 200000 | Completed |
2019 | RGAs Comprehensive Transportation Program '18-'19 | Operating | Section 5310 / JARC / NF | Ray Graham Association | 0 | 766527 | 766527 | 1533054 | In Progress |
2019 | Naperville_Ride DuPage to Work '18-'19 | Operating | Section 5310 / JARC / NF | Naperville | 0 | 660000 | 660000 | 1320000 | In Progress |
2019 | Clearbrook - Community Connections for Adults with Disabilities | Operating | Section 5310 / JARC / NF | Clearbrook | 0 | 100000 | 100000 | 200000 | Completed |
2019 | Little City Transportation Program '18-'19 | Operating | Section 5310 / JARC / NF | Little City Foundation | 0 | 544097 | 544097 | 1088194 | Completed |
2019 | Will Ride '18-19 | Operating | Section 5310 / JARC / NF | Will County | 0 | 160000 | 160000 | 320000 | Programmed |
2019 | McHenry County Service Integration & Coordination '18-19 | Operating | Section 5310 / JARC / NF | McHenry County | 0 | 1200000 | 1200000 | 2400000 | Completed |
2019 | DuPage County Transportation to Work '18-'19 | Operating | Section 5310 / JARC / NF | DuPage County | 0 | 492000 | 492000 | 984000 | Completed |
2019 | Kendall Area Transit_18-'19 | Operating | Section 5310 / JARC / NF | Kendall County | 0 | 320000 | 320000 | 640000 | Completed |
2019 | Will County Will Ride Transportation Services_'18-19 | Operating | Section 5310 / JARC / NF | Will County | 0 | 160000 | 160000 | 320000 | Programmed |
2017 | Ride Lake County Central Dial-a-Ride '16-17 | Operating | Section 5310 / JARC / NF | Lake County | 0 | 119813 | 119813 | 239626 | Programmed |
2017 | Will County Mobility Management Program '16 & '17 | Operating | Section 5310 / JARC / NF | Will County | 0 | 283000 | 283000 | 566000 | In Progress |
2017 | RGAs Ensuring Access to the Community '16-17 | Operating | Section 5310 / JARC / NF | Ray Graham Association | 0 | 1358670 | 1358670 | 2717340 | Completed |
2017 | Ride in Kane Phase 15 & 16 | Operating | Section 5310 / JARC / NF | Association for Individual Development (AID) | 0 | 1544198 | 1544198 | 3088396 | In Progress |
2017 | McHenry County Service Integration & Coordination '16-17 | Operating | Section 5310 / JARC / NF | McHenry County | 0 | 840000 | 840000 | 1680000 | Completed |
2017 | Kendall Area Transit '16-17 | Operating | Section 5310 / JARC / NF | Kendall County | 0 | 300000 | 300000 | 600000 | Completed |
2017 | DuPage County Transportation to Work '16-17 | Operating | Section 5310 / JARC / NF | DuPage County | 0 | 510862 | 510862 | 1021724 | Completed |
2017 | Naperville_Ride DuPage to Work '16-17 | Operating | Section 5310 / JARC / NF | Naperville | 0 | 835692 | 835692 | 1671384 | Completed |
2017 | Little City Transportation to Work '16-17 | Operating | Section 5310 / JARC / NF | Little City Foundation | 0 | 460000 | 460000 | 920000 | Completed |
2016 | Ride Lake County West '16-17 | Operating | Section 5310 / JARC / NF | Lake County | 0 | 321250 | 321250 | 642500 | Programmed |
2015 | Ride Lake County Central Dial-a-Ride '15 | Operating | Section 5310 / JARC / NF | Lake County | 0 | 137602 | 137602 | 275204 | In Progress |
2015 | Ride in Kane Phase 13 & 14 | Operating | Section 5310 / JARC / NF | Association for Individual Development (AID) | 0 | 1549462 | 1549462 | 3098924 | Completed |
2015 | Transportation to Work '15 | Operating | Section 5310 / JARC / NF | DuPage County | 0 | 321024 | 321024 | 642048 | Completed |
2015 | Ride Lake County West '15 | Operating | Section 5310 / JARC / NF | Lake County | 0 | 100985 | 100985 | 201970 | In Progress |
2015 | McHenry County Service Integration & Coordination '15 | Operating | Section 5310 / JARC / NF | McHenry County | 0 | 496291 | 496291 | 992582 | Completed |
2015 | RGAs Comprehensive Program '15 | Operating | Section 5310 / JARC / NF | Ray Graham Association | 0 | 609692 | 609692 | 1219384 | Completed |
2015 | Will County Mobility Management Program '15 | Operating | Section 5310 / JARC / NF | Will County | 0 | 139000 | 199000 | 338000 | Completed |
2015 | Kendall Community Transit Program '15 | Operating | Section 5310 / JARC / NF | Kendall County | 0 | 249251 | 249251 | 498502 | Completed |
2015 | Naperville/Lisle Partners Ride DuPage to Work '15 | Operating | Section 5310 / JARC / NF | Naperville | 0 | 372026 | 372026 | 744052 | Completed |
2014 | Ride Lake County West '13-14 | Operating | Section 5310 / JARC / NF | Lake County | 0 | 177000 | 177000 | 354000 | Completed |
2014 | Ride Lake County Central Dial-a-Ride '13-14 | Operating | Section 5310 / JARC / NF | Lake County | 0 | 163975 | 163975 | 327950 | Completed |
2013 | Naperville/Lisle Partners Ride DuPage to Work '13-14 | Operating | Section 5310 / JARC / NF | Naperville | 0 | 614100 | 614100 | 1228200 | Completed |
2013 | RGAs Comprehensive Program '13-14 | Operating | Section 5310 / JARC / NF | Ray Graham Association | 0 | 474544 | 474544 | 949088 | Completed |
2013 | McHenry County Service Integration & Coordination '13-14 | Operating | Section 5310 / JARC / NF | McHenry County | 0 | 600000 | 600000 | 1200000 | Completed |
2013 | Transportation to Work '13-14 | Operating | Section 5310 / JARC / NF | DuPage County | 0 | 252000 | 252000 | 504000 | Completed |
2013 | Ride in Kane Phase 11 & 12 | Operating | Section 5310 / JARC / NF | Association for Individual Development (AID) | 0 | 575000 | 2875000 | 3450000 | Completed |
2013 | Little City Transportation Program '14 | Operating | Section 5310 / JARC / NF | Little City Foundation | 0 | 174175 | 174176 | 348351 | Completed |
2013 | Transportation for Adults with Intellectual and Developmental Disabilities | Operating | Section 5310 / JARC / NF | Trinity Services | 0 | 173102 | 177662 | 350764 | Completed |
2012 | Naperville/Lisle Partners Ride DuPage to Work '12 | Operating | Section 5310 / JARC / NF | Naperville | 0 | 320911 | 320911 | 641822 | Completed |
2012 | Transportation to Work '12 | Operating | Section 5310 / JARC / NF | DuPage County | 0 | 261581 | 261581 | 523162 | Completed |
2011 | Operation to Enhance Disabled, Senior, and Regular Transportation in Rural Communities '11 | Operating | Section 5310 / JARC / NF | Washington Township | 0 | 10600 | 11300 | 21900 | Completed |
2011 | Volunteer Express '11 | Operating | Section 5310 / JARC / NF | Hanover Township | 0 | 0 | 15454 | 15454 | Completed |
2011 | Naperville/Lisle Partners Ride DuPage to Work '11 | Operating | Section 5310 / JARC / NF | Naperville | 0 | 519405 | 519405 | 1038810 | Completed |
2011 | Ride Lake County West '11 | Operating | Section 5310 / JARC / NF | Lake County | 0 | 500000 | 500000 | 1000000 | Completed |
2010 | Ride to Work Program | Operating | Section 5310 / JARC / NF | Safer Foundation | 0 | 11000 | 11000 | 22000 | Completed |
2010 | Transportation to Work '10 | Operating | Section 5310 / JARC / NF | DuPage County | 0 | 225728 | 225728 | 451456 | Completed |
2010 | Operation to Enhance Disabled, Senior, and Regular Transportation in Rural Communities '10 | Operating | Section 5310 / JARC / NF | Washington Township | 0 | 22500 | 24000 | 46500 | Completed |
2009 | Naperville/Lisle Partners Ride DuPage to Work '09 | Operating | Section 5310 / JARC / NF | Naperville | 0 | 371059 | 371059 | 742118 | Completed |
2009 | #44 Wallace/Racine Bus Route Extension and Service Expansion | Operating | Section 5310 / JARC / NF | Chicago Transit Authority (CTA) | 0 | 459769 | 459769 | 919538 | Programmed |
2009 | Transportation to Work '09 | Operating | Section 5310 / JARC / NF | DuPage County | 0 | 567621 | 567621 | 1135242 | Completed |
2009 | 31st Street - New Bus Route | Operating | Section 5310 / JARC / NF | Chicago Transit Authority (CTA) | 0 | 1067659 | 1067659 | 2135318 | Programmed |
2009 | #54A North Cicero/Skokie Boulevard - Midday Service | Operating | Section 5310 / JARC / NF | Chicago Transit Authority (CTA) | 0 | 130908 | 130908 | 261816 | Programmed |
2009 | #67 67th/69th/71st Street - Bus Route Extension | Operating | Section 5310 / JARC / NF | Chicago Transit Authority (CTA) | 0 | 160372 | 160372 | 320744 | Completed |
2009 | East 83rd Street - New Bus Route | Operating | Section 5310 / JARC / NF | Chicago Transit Authority (CTA) | 0 | 1272135 | 1272135 | 2544270 | Programmed |
2009 | #1 Indiana/Hyde Park Service Expansion | Operating | Section 5310 / JARC / NF | Chicago Transit Authority (CTA) | 0 | 260000 | 260000 | 520000 | Programmed |
2009 | #92 Foster - Late Night Weekend Service | Operating | Section 5310 / JARC / NF | Chicago Transit Authority (CTA) | 0 | 121500 | 121500 | 243000 | Programmed |
2009 | Operation to Enhance Disabled, Senior and Regular Transportation in Rural Communities '09 | Operating | Section 5310 / JARC / NF | Washington Township | 0 | 30000 | 30000 | 60000 | Completed |
2008 | Transportation to Work '08 | Operating | Section 5310 / JARC / NF | DuPage County | 0 | 265040 | 265040 | 530080 | Completed |
2008 | New Clybourn Street Fixed Route Service | Operating | Section 5310 / JARC / NF | Chicago Transit Authority (CTA) | 0 | 2179843 | 2179843 | 4359686 | Programmed |
2008 | #53A South Pulaski | Operating | Section 5310 / JARC / NF | Chicago Transit Authority (CTA) | 0 | 255307 | 255307 | 510614 | Completed |
2008 | Ride Lake County West '08 | Operating | Section 5310 / JARC / NF | Lake County | 0 | 400000 | 400000 | 800000 | Completed |
2008 | #18 16th/18th - Midday Service | Operating | Section 5310 / JARC / NF | Chicago Transit Authority (CTA) | 0 | 464051 | 464051 | 928102 | Completed |
2007 | #65 Grand Avenue & #7 Harrison | Operating | Section 5310 / JARC / NF | Chicago Transit Authority (CTA) | 0 | 886000 | 886000 | 1772000 | Completed |
2007 | Metra Sunrise Express | Operating | Section 5310 / JARC / NF | Metra | 0 | 429000 | 429000 | 858000 | Completed |
2007 | Ride in Kane Phase 1 & 2 | Operating | Section 5310 / JARC / NF | Association for Individual Development (AID) | 0 | 1771134 | 2399934 | 4171068 | Completed |
2007 | Route 895 - 95th Street Rosemont/Schaumburg Express (Formerly Route 889-South Suburban Bus Express Bus Network) | Operating | Section 5310 / JARC / NF | Pace Suburban Bus | 0 | 1050000 | 1050000 | 2100000 | Completed |
2021 | Pace I-90 Service Expansion Phase I | Operating - Mobility Management | Section 5310 / JARC / NF | Pace Suburban Bus | 0 | 633304 | 670556 | 1303860 | Completed |
2021 | Pace Call-N-Ride | Operating - Mobility Management | Section 5310 / JARC / NF | Pace Suburban Bus | 0 | 459783 | 486828 | 946611 | Programmed |
2015 | Pace CTA Skokie Swift Willow Road Connector | Operating - Mobility Management | Section 5310 / JARC / NF | Pace Suburban Bus | 0 | 88248 | 98429 | 186677 | Completed |
2011 | Ride in Kane Phase 7 & 8 | Operating - Mobility Management | Section 5310 / JARC / NF | Association for Individual Development (AID) | 0 | 2761713 | 2851898 | 5613611 | Completed |
2010 | Ride in Kane Phase 5 & 6 | Operating - Mobility Management | Section 5310 / JARC / NF | Association for Individual Development (AID) | 0 | 1268016 | 1313107 | 2581123 | Completed |
2009 | Ride in Kane Phase 3 & 4 | Operating - Mobility Management | Section 5310 / JARC / NF | Association for Individual Development (AID) | 0 | 1632327 | 1690726 | 3323053 | Completed |